Laserfiche WebLink
-NUM", <br />M, T , rl/ <br />The exterior of the pump, associated lines, and the Teflon bailer were also washed with the <br />alconox-water solution using a brush. All equipment was rinsed with potable water and a final <br />spray nnse of distilled water The nylon line used to lower the bailer into the well was disposed <br />of after each use <br />All water sampling was performed in accordance with'WESTON's site specific health and safety <br />plan, which was available on-site during field activities A safety meeting was held before work <br />began in order to review anticipated safety hazards and emergency procedures The field work <br />for this project was performed under Level D personal safety protection. <br />1 L \PROJEC9MANJOQ\TMAO4M QTR 2 12 JmV W 1996 <br />