My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
8010
>
2900 - Site Mitigation Program
>
PR0526994
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 1:52:06 PM
Creation date
10/24/2018 11:47:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526994
PE
2957
FACILITY_ID
FA0018291
FACILITY_NAME
FMS #24 (OMS)
STREET_NUMBER
8010
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726029
CURRENT_STATUS
01
SITE_LOCATION
8010 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C�LIIORXI♦ <br />Water Boards <br />Central Valley Regional Water Quality Control Board <br />30 June 2014 <br />Belinda May, LTC <br />Environmental Compliance Officer <br />10620 Mather Road <br />Mather, CA 95655-4176 <br />JUL 12014 <br />ENVIRONMENTAL HEALTM <br />PERMIT/SERVIC,ES <br />DRAFT FINAL WORK PLAN FOR IMPLEMENTING REMEDIAL ACTION BY /N -SITU <br />CHEMICAL OXIDATION TREATMENT, FIELD MAINTENANCE SHOP #24, <br />STOCKTON CALIFORNIA ARMY NATIONAL GUARD COMPLEX, SAN JOAQUIN <br />COUNTY <br />Central Valley Regional Water Quality Control Board staff (Central Valley Water Board <br />staff) has reviewed the Draft Final Work Plan for Implementing Remedial Action by In - <br />Situ Chemical Oxidation Treatment (Work Plan) received on 4 June 2014. The Work <br />Plan provides the rationale and methods that will be used to treat the petroleum <br />hydrocarbons source area at Field Maintenance Shop #24 with in-situ oxidation. <br />Central Valley Water Board staff comments on the Work Plan are provided below. <br />COMMENTS <br />Based on the information presented in the Work Plan, Central Valley Water Board <br />staff has concluded that the proposed reagent for the second phase of injections is not <br />substantially different from the one injected in September 2013. Therefore, Notice of <br />Applicability R5-2008-0149-045 does not require updating. <br />2. The Work Plan indicates only the one-, three-, and six-month monitoring events will be <br />conducted after injection. However, the Notice of Applicability R5-2008-0149-045 <br />contains a requirement to conduct a 12 -month monitoring event if one or more of the <br />target parameters are more than 20% above background during the six-month <br />monitoring event (see footnote 3 of Table 1 a in the Monitoring and Reporting <br />Program). Revise Section 4.1 and Table 3 in the Work Plan to include this potential <br />monitoring event. <br />KARL E. LONGLEV SCD, P.E., CHAIR I PAMELA C. CREEDON P.E., BCEE, EXECUTIVE OFFICER <br />11020 Sun Center Drive #200, Rancho Cordova, CA 95670 1 www.waterboards.ca.gov/centralvalley <br />Zi R CYGLtU I- <br />EDMUND G. BROWN JR. <br />OO-VEFNOR <br />MATTHEW ODRIOUEZ <br />F <br />SECRETARY FOR <br />ENVIRONMENTAL PROTEGT101. <br />JUL 12014 <br />ENVIRONMENTAL HEALTM <br />PERMIT/SERVIC,ES <br />DRAFT FINAL WORK PLAN FOR IMPLEMENTING REMEDIAL ACTION BY /N -SITU <br />CHEMICAL OXIDATION TREATMENT, FIELD MAINTENANCE SHOP #24, <br />STOCKTON CALIFORNIA ARMY NATIONAL GUARD COMPLEX, SAN JOAQUIN <br />COUNTY <br />Central Valley Regional Water Quality Control Board staff (Central Valley Water Board <br />staff) has reviewed the Draft Final Work Plan for Implementing Remedial Action by In - <br />Situ Chemical Oxidation Treatment (Work Plan) received on 4 June 2014. The Work <br />Plan provides the rationale and methods that will be used to treat the petroleum <br />hydrocarbons source area at Field Maintenance Shop #24 with in-situ oxidation. <br />Central Valley Water Board staff comments on the Work Plan are provided below. <br />COMMENTS <br />Based on the information presented in the Work Plan, Central Valley Water Board <br />staff has concluded that the proposed reagent for the second phase of injections is not <br />substantially different from the one injected in September 2013. Therefore, Notice of <br />Applicability R5-2008-0149-045 does not require updating. <br />2. The Work Plan indicates only the one-, three-, and six-month monitoring events will be <br />conducted after injection. However, the Notice of Applicability R5-2008-0149-045 <br />contains a requirement to conduct a 12 -month monitoring event if one or more of the <br />target parameters are more than 20% above background during the six-month <br />monitoring event (see footnote 3 of Table 1 a in the Monitoring and Reporting <br />Program). Revise Section 4.1 and Table 3 in the Work Plan to include this potential <br />monitoring event. <br />KARL E. LONGLEV SCD, P.E., CHAIR I PAMELA C. CREEDON P.E., BCEE, EXECUTIVE OFFICER <br />11020 Sun Center Drive #200, Rancho Cordova, CA 95670 1 www.waterboards.ca.gov/centralvalley <br />Zi R CYGLtU I- <br />
The URL can be used to link to this page
Your browser does not support the video tag.