Laserfiche WebLink
18600251.02041 <br />25 August 2006 <br />U.S. Army Corps of Engineers, Sacramento District <br />ATTN: CESPK-PM-H (Mr. Gary Krongard) <br />1325 J Street <br />Sacramento, CA 95814-2922 <br />SUBJECT: Submission of the Final Field Sampling Plan, Stockton FMS #24 UST Site, California <br />Army National Guard Site Investigations (USACE Contract Number DACA05-02-D- <br />0007, Task Order 51) <br />Dear Mr. Krongard: <br />Enclosed is a final copy of the CA ARNG Stockton FMS #24 Field Sampling Plan to investigate soil <br />and groundwater contamination in the vicinity of the former diesel and gasoline USTs. This sampling <br />plan is based on information documented in previous Versar reports that were provided to URS by <br />CESPK. This document has also been sent to the CA ARNG Headquarters (to the attention of Scott <br />Hilyard) and the RWQCB (Marcus Pierce). This final plan addresses review comments received from <br />the RWQCB on the draft plan.. <br />If you have any questions or comments, please call me at (916) 679-2267 or Joe Trapasso at (916) <br />679-2207. <br />Sincerely, <br />�tril. ,� <br />Et <br />! '� /, <br />Richard J. Van Dyke <br />Project Manager <br />Enclosure: CA ARNG Stockton FMS #24 UST Final Field Sampling Plan <br />Distribution <br />Joe Trapasso (URS) <br />Ed Titus (URS) <br />Project File (Task Order 51) <br />URS Group, Inc. <br />Crown Corporate Center <br />2870 Gateway Oaks Drive, Suite 150 <br />Sacramento, CA 95833 <br />Tel: 916.679.2000 <br />Fax: 916.679.2900 <br />K:\Wprocess\00251 \CA ARNG\Stockton FSP\FINAL\Stockton FMS #24 Cvr Ltr.doc <br />