My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
14253
>
2900 - Site Mitigation Program
>
PR0515525
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 4:25:05 PM
Creation date
10/24/2018 1:36:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515525
PE
2950
FACILITY_ID
FA0012215
FACILITY_NAME
RCCI PTP
STREET_NUMBER
14253
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
19803031
CURRENT_STATUS
01
SITE_LOCATION
14253 S AIRPORT WAY
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoCa ' 2ecFnics Inc. Page 3 <br /> B of Stockton(Airport) <br /> Project No. 827.2 <br /> October 17, 1999 <br /> The OVM is a portable photo ionization detector that uses a 10.0 eV lamp to detect <br /> compounds with ionization potential below 10.0 eV (hydrocarbon range). A boring log <br /> providing sediment description using the USCS and field observations will be maintained by <br /> a professional geologist working under the supervision of a registered geologist. <br /> 2.2 Groundwater Sample Collection <br /> Groundwater is not expected to be encountered, so groundwater sampling is not proposed. <br /> 2.3 Laboratory Analyses <br /> The soil samples will be submitted to Sherwood Laboratories of Hilmar (State Certified <br /> Laboratory#1400). They will be analyzed for: <br /> • Total Extractable Petroleum Hydrocarbons as diesel, kerosene, motor oil (TEPH-D, <br /> K, MO) by EPA method 3540/8015 (m) <br /> • BTEX by EPA method 8020 <br /> • TPH-G by EPA method 8015(m) <br /> The detection limits for these compounds are listed below. A Chain of Custody will be <br /> completed for all samples collected and tracked to ensure sample integrity. <br /> DetectionLimits: BTEX TPH-Ci '1hFH-D, K,M0 <br /> Soil (ug/Kg) <br /> 3.0 SCHEDULE & REPORTING <br /> The drilling is tentatively scheduled for November 3, 1999. To meet this time frame, we <br /> need the work plan to be approved and a boring permit issued by October 28, 1999. <br /> Ray Kablanow of GTI will supervise the project. A copy of the report will be forwarded to <br /> SJC PHS/EHD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.