My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
26250
>
2900 - Site Mitigation Program
>
PR0506525
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 9:18:19 PM
Creation date
10/24/2018 2:10:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506525
PE
2960
FACILITY_ID
FA0007475
FACILITY_NAME
MCMULLIN DEHYDRATOR STATION
STREET_NUMBER
26250
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
25703010
CURRENT_STATUS
01
SITE_LOCATION
26250 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 6 <br /> Pacific Gas and Electric Company Technical and Ecological Services <br /> 3400 Crow Canyon Road <br /> San Ramon,CA 94583 <br /> 510/820-2000 C <br /> "l ' P1112- 44 <br /> May 27, 1998 <br /> Mr. Steven Sasson <br /> San Joaquin County Public Health Services Dept. <br /> Environmental Health Division <br /> r P.O.Box 388 <br /> Stockton,CA 95201-0388 <br /> Re: Work Plan for Bioremediation Project,Pacific Gas and Electric Company, <br /> McMullin Gas Dehydrator Station, San Joaquin County,California <br /> Dear Mr. Sasson: <br /> Per our conversation earlier today,I am sending you a copy of the workplan and the RWQCB approval <br /> letter for your information. This bioremediation project is an R&D study where we will attempt to enhance <br /> the biodegradation of petroleum hydrocarbons in both the saturated and unsaturated zones by injecting <br /> Regenesis®Oxygen Releasing Compound(ORC)into several boreholes drilled in the area of TPH impact. <br /> Presently,we plan to install the additional groundwater monitoring wells on June l Id and 12",and <br /> perform the ORC injections during June 22"d through 24". <br /> We will be contacting you next week regarding permits for the installation of the monitoring wells and the <br /> ORC injection points. <br /> Please contact me at(925)866-5883 if you have any questions or comments regarding the enclosed <br /> workplan or this project. <br /> Sincerely, <br /> r <br /> Darrell Klingman <br /> Certified Hydrogeologist No. 160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.