Laserfiche WebLink
1 <br /> Unnamed Dirt Road <br /> Gate <br /> \ / Location of <br /> Former <br /> \ Reboiler—. <br /> Concrete Basin and Berms i <br /> i I • • , <br /> Production i <br /> Fluids <br /> } I Tank i <br /> iFormer Sump <br /> I— I <br /> �O i <br /> < Former Contactor <br /> • <br /> a <br /> I Tower i <br /> - ------- --------- <br /> Contactor Tower i <br /> Gas I <br /> Supply I I <br /> iLines O :eboiler <br /> I <br /> r--- <br /> Buried Fence I <br /> i — .l—_ <br /> Odorizer <br /> i <br /> —EI—Building <br /> Control <br /> I <br /> � I I <br /> Note: Location of underground utilities is speculative. <br /> EXPLANATION <br /> 0 10 20 30 • Proposed soil boring/ <br /> _ groundwater grab sample <br /> Scale in Feet <br /> Figure 8. Site Plan of McMullin Gas Dehydrator Station showing <br /> proposed soil boring/groundwater grab sample locations. <br /> 9608133/mcmulbodpc 19 <br /> 4-8 <br />