My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
26250
>
2900 - Site Mitigation Program
>
PR0506525
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 10:03:43 PM
Creation date
10/24/2018 2:11:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506525
PE
2960
FACILITY_ID
FA0007475
FACILITY_NAME
MCMULLIN DEHYDRATOR STATION
STREET_NUMBER
26250
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
25703010
CURRENT_STATUS
01
SITE_LOCATION
26250 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ty <br />O <br />o_ <br />Gas <br />Supply <br />Lines <br />Agricultural Field <br />Ditch <br />•B-13 <br />Dirt Road <br />•MC -B7 <br />/ Area of TPH-impacted soil <br />•B-12 <br />•MC -B8 '__�> <br />_('OURS <br />- , PZ -2 <br />I � I I/ <br />Note: Monitoring wells MW -1, MW -3 and MW -4 are not shown <br />0 10 20 30 because they were installed outside of the limits of this map. <br />i <br />Scale in Feet <br />Figure 3. Site plan of McMullin Gas Dehydrator Station showing location of <br />soil borings performed during previous site investigations and area <br />of on-site TPH-impacted soil. <br />' 980440/soil-bora/pc19 <br />1-5 <br />-PZ-3 <br />MC -B6 <br />AC <br />• <br />• Concrete Basin <br />(c^ <br />B-11 <br />and Berms <br />Reboiler <br />'I <br />r - - - - - •MC•87 <br />MC•81 � i• <br />-B2 <br />MW2 <br />- - - - ' <br />•B•10 MC -B9 <br />• <br />.. <br />• •MC -B4 <br />19-B1 <br />Sump ---.O <br />0 <br />MC•B5 Production <br />• Fluids Tank <br />MC -639 <br />•19-B2 <br />B-9 <br />• <br />r - -, Contactor <br />--- <br />— <br />--— <br />—— — —I—�— Tower <br />I � <br />-=-- 1 <br />Reboiler <br />PZ -4 <br />A <br />J <br />Buried • B•6 <br />A PZ -1 <br />Odorizer Control <br />Building <br />I � I I/ <br />Note: Monitoring wells MW -1, MW -3 and MW -4 are not shown <br />0 10 20 30 because they were installed outside of the limits of this map. <br />i <br />Scale in Feet <br />Figure 3. Site plan of McMullin Gas Dehydrator Station showing location of <br />soil borings performed during previous site investigations and area <br />of on-site TPH-impacted soil. <br />' 980440/soil-bora/pc19 <br />1-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.