Laserfiche WebLink
City of Stockton <br /> Page 2 <br /> 1740 Houston <br /> I Monitoring well (MW) 3 has that had been located has been sampled and <br /> it appears the well is still viable. Two additional monitoring wells have <br /> been installed. Newly installed monitoring well 4 had 660 parts per billion <br /> of MTBE in the water sample collected from it. Further investigation has <br /> been proposed by the consultant. PHSIEHD will review the recently <br /> submitted report from the consultant_ and all site information and comment <br /> t on the proposed further work. <br /> 6803 Alexandria <br /> E PHS/EHD has issued a "no further action required" letter for this site. <br /> i <br /> 1116 First <br /> ' Monitoring well 1 is the only well evidencing'#contamination. The water is <br /> 10 feet above the screen interval in this well'. Water samples from all the <br /> wells will be collected and analyzed in December F1999. If the results of <br /> *` those water samples are the same as or lower than the previous water <br /> samples, PHSIEHD will request concurrence from the Central Valley <br /> Regional Water Quality Control Board (CVRWQCB) for "no further action <br /> required" at this site. <br /> I <br /> 1701 Washington <br /> The underground storage tank (UST) pipingjhas been closed in place and <br /> the soil sample collected beneath the dispenser was non detect for <br /> contaminants. A request for concurrence from the CVRWQCB for " no <br /> further action required" at this site has been prepared. <br /> Royal Oaks at Princess ' <br /> Investigation of the site has been performed. MTBE was not requested in <br /> the analysis of the samples submitted to the laboratory. The laboratory <br /> ` has read the chromatogram of the samples analyzed and provided a <br /> revised analysis that includes MTBE. Since,the meeting PHSIEHD has <br /> received concurrence from the CVRWQCB for "no further action required" <br /> { at this site. Once destruction of the soil boring that pierced a storm drain <br /> (that now requires repair) is completed,the "no further action required" <br /> letter will be prepared. <br /> I <br /> : <br />