My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001782
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
17
>
2900 - Site Mitigation Program
>
PR0506167
>
ARCHIVED REPORTS XR0001782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 10:44:54 AM
Creation date
10/25/2018 10:30:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0001782
FileName_PostFix
XR0001782
RECORD_ID
PR0506167
PE
2959
FACILITY_ID
FA0007245
FACILITY_NAME
GUILD CLEANERS
STREET_NUMBER
17
Direction
S
STREET_NAME
CHURCH
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04303206
CURRENT_STATUS
01
SITE_LOCATION
17 S CHURCH ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised LFR Levine-Fricke <br /> necessary blower and treatment design parameters for the Phase 11 SVE pilot test and <br /> for a full-scale system, if appropriate. <br /> 'Me following addatonal analyses will be conducted- <br /> • tabulations and plots of aur flow verses extraction pressures for each of the acuve <br /> test sequences to assist in sizing and specifying SVE blowers and piping <br /> • plan view and optimized plata view estimates of the area of mfluerce for each of the <br /> constant rate extraction scenarios <br /> • tabulations and plots of VOC mass removal rates for the constant rate test to <br /> estimate the likely duration of operation for an SVETS <br /> • comparisons of VOC, oxygen, and carbon dioxide concentrations, aW oxygen- <br /> carbon dioxide rmUos for the constant rate test scenario to assess the average <br /> stoichiamctric and air flushing rates from SVE <br /> • estimations of rates of VOC toadmg at different extraction flow rates and estimated <br /> remediation rates to size and optnium the extraction system <br /> 6.0 PHASE If PILOT TEST (SVE) <br /> 6,1 Phase 11 Pilot Test Goals <br /> After completion of the Pbase I SVE pilot test, a longer duration vapor extraction pilot <br /> test will be performed at the Site <br /> The goal of the Phase 11 SVE pilot testlanvestigation will be to assess the effectrvene43 <br /> of the long-term vapor extraction in redo ng vadose zone and/or groundwater PCE <br /> concentmuorts <br /> The investigaUon assessment data will be used to evaluate the applicability, <br /> effectiveness, and cost that would be expected for the design of a full-scale SVE <br /> system <br /> 5,2 Phase 11 Data Analysis <br /> After completion of the Phase II tests, the following analyses will be performed, <br /> calculation of average air permeability <br /> • estimation of Theoreucal Maximum Radius of Influence(TMROn due to vapor <br /> extraction from a single extraction well, to be used in conjunction with <br /> estunation of the criacal pore gas velocity and the calculation of pore volume <br /> flushing <br /> wp.SVFGS-L*dt-mv-W23dmUr Page�9 <br /> 00/sT d WT0b9b60ZT 01 906V E99 OTS 3>01�U 3NIATI 2U-1 lid K 9t 20, 60 '"nf <br />
The URL can be used to link to this page
Your browser does not support the video tag.