My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001782
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
17
>
2900 - Site Mitigation Program
>
PR0506167
>
ARCHIVED REPORTS XR0001782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 10:44:54 AM
Creation date
10/25/2018 10:30:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0001782
FileName_PostFix
XR0001782
RECORD_ID
PR0506167
PE
2959
FACILITY_ID
FA0007245
FACILITY_NAME
GUILD CLEANERS
STREET_NUMBER
17
Direction
S
STREET_NAME
CHURCH
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04303206
CURRENT_STATUS
01
SITE_LOCATION
17 S CHURCH ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised OR Levine Fricke <br /> Section 4 2 of the Quality Assurance Project Plan(Appendix C to the RJ/FS Work <br /> Plan, dated Apn124. 2002]) <br /> All sampling and laboratory quality assurance protocol identified in Appendix B of the <br /> Draft RI/FS Work Pian will be followed <br /> 10.0 SCHEDULE <br /> A schedule for unpletneatation of the Phase I and the Phase Xl portions of this pilot <br /> study is presented below. After completion of the Phase II portion of the pilot study, <br /> LFR will prepare a report documenting the findings of the Phase I and II programs of <br /> the pilot study. <br /> PROPOSED SCHEDULE <br /> Task for Implementation of Phase l and phase li Programs Bate of Completion <br /> Agency Approval of Work Pian June 28, 2002 <br /> Permits procurement- City of Lodi and Sin Joaquin County Ate July 3, 2002 <br /> Pollution Control District <br /> iDesign of blot Test July 10, 2OD2 <br /> Procurement of Treaumnt System Equipment July 17, 2002 <br /> Construction of Eximenon System Ptptttg August 1, 2002 <br /> Phase I Program August 15, 2002 <br /> Me=of Fmdmp of Phase i Pilot Test August 31. 2002 <br /> Initiate Phase II Pdot Test September 15, 2002 <br /> LFR will provide agencies with a schedule for unplementatton of Phase II, Phase III, <br /> and Phase IV studies at a later date, LFR will provide the regulators with status update <br /> memos and data between each of the completed phases, and will meet with the <br /> regulatory officials as necessary <br /> w i--SM& od,rav-0$123 dot ttr Page 33 <br /> Ob/2Z d $£T 0b9PSOFT 01 906P E99 OTS 3>018=1 3N 1 r)31 21=1 a-1 00 SIT Ze. 60 -nr <br />
The URL can be used to link to this page
Your browser does not support the video tag.