My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001782
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
17
>
2900 - Site Mitigation Program
>
PR0506167
>
ARCHIVED REPORTS XR0001782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 10:44:54 AM
Creation date
10/25/2018 10:30:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0001782
FileName_PostFix
XR0001782
RECORD_ID
PR0506167
PE
2959
FACILITY_ID
FA0007245
FACILITY_NAME
GUILD CLEANERS
STREET_NUMBER
17
Direction
S
STREET_NAME
CHURCH
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04303206
CURRENT_STATUS
01
SITE_LOCATION
17 S CHURCH ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Table 4 <br /> Phase IV SVEIGGS Prot'fest <br /> Monrto6ng Parameters for SVFJG05 Pilot Test <br /> N Guild Cleaners, Lodi,California <br /> a <br /> Dissolved Oxygen <br /> m Spargmg 5pargsng Flow I�Lantta7sng tss General Chemistry 117 VO[Coilceniratton to <br /> H Parameter Pressure Rate Well Pressure and u> Water l evels Groundwater(laboratory) Groundwater(Laboratory) <br /> Groundwater <br /> v <br /> U3 <br /> m <br /> Metbodllnstrlrmentation Control Panel Control Panel Pressure DO Meter, flectrlc <br /> � Yarious`r1 EPA Method 8260 <br /> N Pressure Gauge Flow Mgter Transducer pH Metter,OR? Sounder <br /> o SVE Not Test <br /> tD <br /> Routine SVE Mowtorut sinviar to tau Please Il Pitot Test wil be pedmMed during this pbaae <br /> N <br /> GOS Pilot Test <br /> T e of Test <br /> <n Baseline Monitoring NA NA NA Sampling event 9 Groundwarer Sampling event conducted w rtes Swglmg event conducted at th <br /> conducted at the and of Moauoring Wells end of Phase Ir test end of Fbase 0 rest <br /> Ui Phase It teu <br /> 6 <br /> Ozone Spargmg Phase Weotdy Weekly Weekly0i WOW 9 Groundwater 9 SAMPLE PI]INrVo 9 SAMPLE POIMiSnr <br /> Motutonag Wells matey Mommy <br /> Z Mondrly <br /> } <br /> Lu one Sparging Recovery Phase NA NA NA Weckly ' 9 Gtnundtvater 9 SAMPLE POINTS¢' 9 SAMPLE POIlfTSo' <br /> t30 days after completion of ozone Monitoring Wells Every 2 Weeks Every 2 Weds <br /> sparging) Moinitfy <br /> tz <br /> !Totes. <br /> Routine SVE Monitoring similar to rhe Phase II Pilot Test Monitoring will be performed during this phase <br /> Dfl-dissolved oxygen <br /> PID-phatononizaticit detector <br /> NA-test not appltmhk <br /> h `ti AWAIUtlty(as CaCO3)using EPA Method 3101,chloride using EPA Metbod 325 3.Hardness using EPA Marbod 130 2 <br /> 'Wetts FSEW-1,2,and 3,PSEW-7,S,ad 9.PSEW-S.G-06 w d MWM <br /> I <br /> I <br /> Piioi Study WYTobtr,09123 x1sM14 SVE-Oaone5parging Ptge 1 of 1 619102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.