Laserfiche WebLink
Revisers LFR LevinwFricke <br /> i <br /> 1.0 INTRODUCTION <br /> Ibis Work Plan is a revision of the November 16, 2001 Pilot Test Work Plan presented <br /> at a Department of Toxic Substances Control (DTSQ meeting on March 13, 2002 for <br /> Guild Cleaners ("the Propp'rty% Ionated at 17 and 31 South Church Strut in the City <br /> of Loch ("the City"), Cotitty of Sari Joaquin, Califorwa This Work Plan has been <br /> prepared by LFR Levine Fricke (LFR) at the request of Lon Gualco, Esq , on behalf <br /> of Guild Cleaners. Inc. ("Project Proponent"), for a Sod Vapor Extraction and <br /> Groundwater Sparging pilot study ("Work Plan") <br /> In accordance with the April 29, 2002 "Rmnedtal Investigation and Feasibility Study <br /> Work Plan," this Work Plan is also being submitted in accordance with Section <br /> 300.430(d)(1) of the NCP which states "a treatability study shat! be conducted, when <br /> appropriate and practical, to provide additional data for a detailed analysis and to <br /> support engineering design of remedial alternatives." This Work Phil will also be <br /> performed using the -Guide to Conducting Treatability Studies Under CERCLA <br /> (EPA 1992) and ilia Guidance Document for Conducting Remedial Investigations and <br /> Feasibility Studies Under CERCLA (EPA 1989) consistent with the NCP <br /> This Work Plan reflects changes and responds to comments discussed with the DTSC <br /> on March 13, 2002 It also reflects changes to the site conceptual model which resulted <br /> from LFR's investigation completed under the "Revised Supplemental Site <br /> Investigation Work Plan, Guild Cleaners, 17 South Church Street, Lodi, California," <br /> dated October 1, 2001, prepared by LFR ("the Revised Supplemental Site Investigation <br /> Work Plan", LFR 2001), and as amended on November I6, 2001 <br /> 71ius Work Plait describes activities to be conducted during a soil vapor extraction and <br /> _ gmandwater sparging (SVE/GS)pilot study The SVEIGS pilot swdy will be <br /> performed in four phases. <br /> • Phase I will consist of air flow and vacuum monitoring during operation of a pilot <br /> scale soil vapor extraction and treatinent system(SUETS) <br /> • Phase II will Consist of a longer duration SVE test <br /> • Phase III will consist of a combined soil vapor extraction and groundwater air <br /> sparging (SVEIGAS)pilot study rising nine combined soil vapor extraction wells <br /> and sparging wells. <br /> - Phase N will take place after completion of Phase III of the pilot study It will <br /> consist of a combined soil vapor extraction and grrowdwater ozone sparging <br /> (SVi /GOS) pilot study <br /> In recognition of potential issues in relying solely on radius of uifluence (ROI) testing <br /> for soil vapor extraction design, LFR will collect the necessary data to estimate a <br /> critical pore gas velocity to be used in the design of the vapor extraction system, This <br /> Vq-rsyscs�L0b-My-W]23 aoc ih Page 1 <br /> 00/90 d 82T0t,9b60ZI 01 9060 ES9 OTS 3N0I2I3 3NIA37 2137 6d SE 91 20, 60 Iof <br />