Laserfiche WebLink
SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES - MIROM ENTAL HEALTH DIVSIONUD <br />UDERGROSTORAGE TANK PROGRAM- FEE WORKSHEET <br />/FST -FA C <br />ILITY SITE NAME FACILITY CONTACT NAME <br />' (T -- I `� 5fo 7� v C 1 <br />T <br />E FACILITY ADDRESS 1 SITE PHONE 0 with AREA CODE <br />CITY STATE ZIP CODE 0 of TANKS <br />A r1 C �j at SITE <br />P / i'' <br />P APPLICANT/B LLING NAME APPLICANT CONTACT NAME <br />L <br />1 <br />C MAILING ADDRESS APPLICANT PHONE if WITH AREA CODE <br />A <br />N <br />T CITY STATE ZIP CODE TYPE of APPLICATION <br />(Closure, Installation, etc.) <br />TnTAI <br />ANNUAL FACILITY FEE (Prior to January 1, 1991) $100.00 1986 1987 1988 1989 1990 <br />A $ <br />C <br />T FACILITY PENALTY FEES ASSESSED (If Applicable) XXXX XXXX S <br />I <br />V TANK FEE = S50.00/TANK (Prior to January 1,1991) $170/TANK (After January 1, 1991) <br />E <br />N Tanks_ 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 <br />F (multiply # y fee for <br />A each year applicable) <br />I TANK PENALTY FEES ASSESSED XXXX XXXX $ <br />L P Lj <br />I STATE SURCHARGE _ $56.00 each TANK (Due every 5 years) See California H b S Code, Section 2 7 <br />T <br />Y # Tanks x $56.00 1986 through 1990 1991 through 1996 <br />(Enter amount and year) <br />$ <br />C PERMANENT CLOSURE (Removal or Authorized Closure -in -Place) TANK I.D. 0(s) <br />L <br />0 CLOSURE FEE = $78.00/hour (3 hours minimum/TANK) $ TANK(s) X $234.0 IRONME � HEALTH <br />S <br />U TEMPORARY CLOSURE (Plan Review 8 Inspections) TANK I.D. N(s) <br />R <br />E TEMPORARY CLOSURE FEE _ $78.00/hour (3 hours minimum/TANK) N TANK(s) X $234.00 S <br />P INSTALLATION PLAN CHECK (Plan Review b Construction Inspections) TANK I.D. #(s) <br />L <br />A <br />N PLAN CHECK FEE = $78.00/hour (8 hours minimum/FACILITY) 5624.00 minimum S <br />R REPAIR FEE (Workp(an Review R Construction Inspections) TANK I.D. *(s) <br />E <br />P TANK LINING REPAIR FEE = $78.00/hour (3 hours minimum/TANK) 0 TANK(s) X $234.00 = $ <br />A <br />I TANK RETROFIT REPAIR FEE _ $78.00/hour (3 hours min./FACILITY) _ $234.00 minimum % <br />R <br />PIPING REPAIR FEE = S78.00/hour (3 hours minimum/FACILITY) = $234.00 minimum $ <br />M TRANSFER FEE ■ S20.00 UNAUTHORIZED RELEASE EVALUATION - $78.00/hr-- <br />I <br />S <br />C CONSULTATION FEE = S78.00/hr SAMPLING INSPECTION FEE _ $78.00/hr S <br />' 7 TOTAL DUE <br />FOR OFFICE USE ONLY <br />................ ............. <br />.............•...u•.u..�:��u::::::uvvvvvm 1 • ip' 'tl ' ltYt' <br />SWEEPS (f COMPUTER 0_1 LOC CODE I DIST CODE I AMOUNT RECEIVED I CHECK VCASH <br />EH 23 032 (REVISED 11-1-92) page 09 <br />RECEIVED BY <br />2, <br />DATE RECEIVED <br />TnTAI <br />ANNUAL FACILITY FEE (Prior to January 1, 1991) $100.00 1986 1987 1988 1989 1990 <br />A $ <br />C <br />T FACILITY PENALTY FEES ASSESSED (If Applicable) XXXX XXXX S <br />I <br />V TANK FEE = S50.00/TANK (Prior to January 1,1991) $170/TANK (After January 1, 1991) <br />E <br />N Tanks_ 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 <br />F (multiply # y fee for <br />A each year applicable) <br />I TANK PENALTY FEES ASSESSED XXXX XXXX $ <br />L P Lj <br />I STATE SURCHARGE _ $56.00 each TANK (Due every 5 years) See California H b S Code, Section 2 7 <br />T <br />Y # Tanks x $56.00 1986 through 1990 1991 through 1996 <br />(Enter amount and year) <br />$ <br />C PERMANENT CLOSURE (Removal or Authorized Closure -in -Place) TANK I.D. 0(s) <br />L <br />0 CLOSURE FEE = $78.00/hour (3 hours minimum/TANK) $ TANK(s) X $234.0 IRONME � HEALTH <br />S <br />U TEMPORARY CLOSURE (Plan Review 8 Inspections) TANK I.D. N(s) <br />R <br />E TEMPORARY CLOSURE FEE _ $78.00/hour (3 hours minimum/TANK) N TANK(s) X $234.00 S <br />P INSTALLATION PLAN CHECK (Plan Review b Construction Inspections) TANK I.D. #(s) <br />L <br />A <br />N PLAN CHECK FEE = $78.00/hour (8 hours minimum/FACILITY) 5624.00 minimum S <br />R REPAIR FEE (Workp(an Review R Construction Inspections) TANK I.D. *(s) <br />E <br />P TANK LINING REPAIR FEE = $78.00/hour (3 hours minimum/TANK) 0 TANK(s) X $234.00 = $ <br />A <br />I TANK RETROFIT REPAIR FEE _ $78.00/hour (3 hours min./FACILITY) _ $234.00 minimum % <br />R <br />PIPING REPAIR FEE = S78.00/hour (3 hours minimum/FACILITY) = $234.00 minimum $ <br />M TRANSFER FEE ■ S20.00 UNAUTHORIZED RELEASE EVALUATION - $78.00/hr-- <br />I <br />S <br />C CONSULTATION FEE = S78.00/hr SAMPLING INSPECTION FEE _ $78.00/hr S <br />' 7 TOTAL DUE <br />FOR OFFICE USE ONLY <br />................ ............. <br />.............•...u•.u..�:��u::::::uvvvvvm 1 • ip' 'tl ' ltYt' <br />SWEEPS (f COMPUTER 0_1 LOC CODE I DIST CODE I AMOUNT RECEIVED I CHECK VCASH <br />EH 23 032 (REVISED 11-1-92) page 09 <br />RECEIVED BY <br />2, <br />DATE RECEIVED <br />C PERMANENT CLOSURE (Removal or Authorized Closure -in -Place) TANK I.D. 0(s) <br />L <br />0 CLOSURE FEE = $78.00/hour (3 hours minimum/TANK) $ TANK(s) X $234.0 IRONME � HEALTH <br />S <br />U TEMPORARY CLOSURE (Plan Review 8 Inspections) TANK I.D. N(s) <br />R <br />E TEMPORARY CLOSURE FEE _ $78.00/hour (3 hours minimum/TANK) N TANK(s) X $234.00 S <br />P INSTALLATION PLAN CHECK (Plan Review b Construction Inspections) TANK I.D. #(s) <br />L <br />A <br />N PLAN CHECK FEE = $78.00/hour (8 hours minimum/FACILITY) 5624.00 minimum S <br />R REPAIR FEE (Workp(an Review R Construction Inspections) TANK I.D. *(s) <br />E <br />P TANK LINING REPAIR FEE = $78.00/hour (3 hours minimum/TANK) 0 TANK(s) X $234.00 = $ <br />A <br />I TANK RETROFIT REPAIR FEE _ $78.00/hour (3 hours min./FACILITY) _ $234.00 minimum % <br />R <br />PIPING REPAIR FEE = S78.00/hour (3 hours minimum/FACILITY) = $234.00 minimum $ <br />M TRANSFER FEE ■ S20.00 UNAUTHORIZED RELEASE EVALUATION - $78.00/hr-- <br />I <br />S <br />C CONSULTATION FEE = S78.00/hr SAMPLING INSPECTION FEE _ $78.00/hr S <br />' 7 TOTAL DUE <br />FOR OFFICE USE ONLY <br />................ ............. <br />.............•...u•.u..�:��u::::::uvvvvvm 1 • ip' 'tl ' ltYt' <br />SWEEPS (f COMPUTER 0_1 LOC CODE I DIST CODE I AMOUNT RECEIVED I CHECK VCASH <br />EH 23 032 (REVISED 11-1-92) page 09 <br />RECEIVED BY <br />2, <br />DATE RECEIVED <br />P INSTALLATION PLAN CHECK (Plan Review b Construction Inspections) TANK I.D. #(s) <br />L <br />A <br />N PLAN CHECK FEE = $78.00/hour (8 hours minimum/FACILITY) 5624.00 minimum S <br />R REPAIR FEE (Workp(an Review R Construction Inspections) TANK I.D. *(s) <br />E <br />P TANK LINING REPAIR FEE = $78.00/hour (3 hours minimum/TANK) 0 TANK(s) X $234.00 = $ <br />A <br />I TANK RETROFIT REPAIR FEE _ $78.00/hour (3 hours min./FACILITY) _ $234.00 minimum % <br />R <br />PIPING REPAIR FEE = S78.00/hour (3 hours minimum/FACILITY) = $234.00 minimum $ <br />M TRANSFER FEE ■ S20.00 UNAUTHORIZED RELEASE EVALUATION - $78.00/hr-- <br />I <br />S <br />C CONSULTATION FEE = S78.00/hr SAMPLING INSPECTION FEE _ $78.00/hr S <br />' 7 TOTAL DUE <br />FOR OFFICE USE ONLY <br />................ ............. <br />.............•...u•.u..�:��u::::::uvvvvvm 1 • ip' 'tl ' ltYt' <br />SWEEPS (f COMPUTER 0_1 LOC CODE I DIST CODE I AMOUNT RECEIVED I CHECK VCASH <br />EH 23 032 (REVISED 11-1-92) page 09 <br />RECEIVED BY <br />2, <br />DATE RECEIVED <br />R REPAIR FEE (Workp(an Review R Construction Inspections) TANK I.D. *(s) <br />E <br />P TANK LINING REPAIR FEE = $78.00/hour (3 hours minimum/TANK) 0 TANK(s) X $234.00 = $ <br />A <br />I TANK RETROFIT REPAIR FEE _ $78.00/hour (3 hours min./FACILITY) _ $234.00 minimum % <br />R <br />PIPING REPAIR FEE = S78.00/hour (3 hours minimum/FACILITY) = $234.00 minimum $ <br />M TRANSFER FEE ■ S20.00 UNAUTHORIZED RELEASE EVALUATION - $78.00/hr-- <br />I <br />S <br />C CONSULTATION FEE = S78.00/hr SAMPLING INSPECTION FEE _ $78.00/hr S <br />' 7 TOTAL DUE <br />FOR OFFICE USE ONLY <br />................ ............. <br />.............•...u•.u..�:��u::::::uvvvvvm 1 • ip' 'tl ' ltYt' <br />SWEEPS (f COMPUTER 0_1 LOC CODE I DIST CODE I AMOUNT RECEIVED I CHECK VCASH <br />EH 23 032 (REVISED 11-1-92) page 09 <br />RECEIVED BY <br />2, <br />DATE RECEIVED <br />M TRANSFER FEE ■ S20.00 UNAUTHORIZED RELEASE EVALUATION - $78.00/hr-- <br />I <br />S <br />C CONSULTATION FEE = S78.00/hr SAMPLING INSPECTION FEE _ $78.00/hr S <br />' 7 TOTAL DUE <br />FOR OFFICE USE ONLY <br />................ ............. <br />.............•...u•.u..�:��u::::::uvvvvvm 1 • ip' 'tl ' ltYt' <br />SWEEPS (f COMPUTER 0_1 LOC CODE I DIST CODE I AMOUNT RECEIVED I CHECK VCASH <br />EH 23 032 (REVISED 11-1-92) page 09 <br />RECEIVED BY <br />2, <br />DATE RECEIVED <br />' 7 TOTAL DUE <br />FOR OFFICE USE ONLY <br />................ ............. <br />.............•...u•.u..�:��u::::::uvvvvvm 1 • ip' 'tl ' ltYt' <br />SWEEPS (f COMPUTER 0_1 LOC CODE I DIST CODE I AMOUNT RECEIVED I CHECK VCASH <br />EH 23 032 (REVISED 11-1-92) page 09 <br />RECEIVED BY <br />2, <br />DATE RECEIVED <br />