Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORT' <br /> +� UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490.2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agent Use Only) _ 1 <br /> BUSINESS NAME(Same as FACILITY NAME)A-ONE GAS AND FOOD 3. <br /> BUSINESS SITE ADDRESS 574 WEST GRANTLINE RD 103. CITY T VICES 104" <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCRJ2632,2634,2638,2641) _ <br /> --- -__ <br /> -- --- --------------------------------------- <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY 490-3a <br /> ❑ 99.OTHER(Specify): 490-3b <br /> III.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 0 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONTTORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> --- SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> ----------"------- <br /> PANEL------------------MANUFACTURER: VEEDRE ROOT _ 490-7. 1 MODEL#: TLS-350 _440T <br /> ---------___-__-____-- <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 490-9 ; MODEL#(S): 794390-409 490--10-- <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG) <br /> --_-_SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> ----------___- PANEL- MODEL#: <br /> MANUFACTURER: 490-12. 490-13 <br /> -- --------------- --__-__ <br /> IN-TANK PROBE MANUFACTURER: ago-1a. 490.15 <br /> ---_--_-_ MODEL#(S): <br /> - - --- - - --- _____-_ - -- ----------------------490-16 <br /> LEAK TEST FREQUENCY: F-1 a.CONTINUOUS El b.DAILY/NIGHTLY Elc.WEEKLY 490-16 <br /> -------------------------- 0 d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> --- --_ -_- - - -__ -----_------ - - - <br /> PROGRAMMED TESTS: ❑ a.0.1 h. 490-18 <br /> g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: F-1 a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490-z2 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY 490-24 <br /> Q ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> ❑99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> IN 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49028 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> -------------------------- -- -------- - - - - - MOD_- ---50-------------------- <br /> PANEL MANUFACTURER:VEEDER ROOT 490-30 EL#: TLS-3 - 490-31 <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT 490-32 1 MODEL#(S): 794390-208 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ❑b.NO 490-14 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-35 <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT F-LOW WHEN A LEAK IS DETECTED 23 CCR 2636 490.36 <br /> --- _- - - -�-_--- -- - - -- ----- - -- - <br /> MLLD MANUFACTURER(S):VAPORLESS MANUFACTURING INC.(VMI) 490-37 MODEL#(S): VMI-LD-2000 490-38 <br /> ❑ 3_ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURER(S) 410' I MODEL#(S): a9°"al <br /> PROGRAMMED IN LINE LEAK TEST: -- .MINI A --------~____-_--- 490.42 <br /> ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. F-1 2.MINIMUUMM ANNUAL 0.1 g.p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 49046 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-4649047 <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> Allowed for monitoring of unburied emergency enerator ruel pipin only HSC 625281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(x)(3)). 490-50 <br /> Lj 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />