Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tanks} <br /> b. Tank/Piping Hauler. <br /> Name L-)i!S i Cc)4S <br /> ---Address <br /> Phone No C (7 () r S 9:3 -U <br /> Hauler Registration#(i1 hauled as hazardous) <br /> C. Tank/Piping Disposal Site: <br /> Name ��r�� C OA's <br /> Address jS��O L�r�1�c�t� CitfrU 2 l-y C_e 21p `Y3 C�SS <br /> Phone No4a 0 <br /> EPA M#(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an independent third party from the contractor? YES W"'NO() <br /> 9a. Describe,in detail,how the soil and/or water sample(s)beneath the tank and piping will be obtained: <br /> SIOL"I 5 :tl (S i- A9Oo(,(+7_ <br /> V'-t P1 iLdto.-I L�c)LrE i <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> —lig n , 11 )JAS <br /> b)What will be the final destination of the excavated stockpile? <br /> ti k'oQ pr_i l�M�u�:i:- A So,1 SA M�I�, i S ►�i iy t�.�O via.�► L.4�S <br /> c)Contaminated Soil Hazardous Waste Hauler. <br /> Name ly t ry. p \ Hauler Registration# <br /> Address I L 1 2 Y�,e I� T`q Cl Zip <br /> Phone No. 2b <br /> EH 23 046(Revised 10/19198) Page 5 <br />