My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
REMOVAL 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:07:25 PM
Creation date
10/26/2018 2:14:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1998
FileName_PostFix
1998
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACKFILL EXCAVATION CERTIFICATE <br /> Project Location <br /> Owner Phone No. <br /> Contractor Phone No. License No. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, w., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12 lifts: <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> * <br /> Name rent <br /> * <br /> Title rent <br /> * <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.