Laserfiche WebLink
8. a. Describe the method that will be utilized to purge andlor inert the tank(s): <br />b. TanklPiping Hauler- <br />Name <br />auler <br />Name Co AS + LQ,-: <br />Ad ear ss f"_C� �.0 c_..; u� 1�----- t u Z- iL-_yip- <br />Phone No (D.1 ('- C (j — _� _� -7 X <br />Hauler Registration # (lf hauled as <br />C. TanklPiping Disposal Site: <br />Name <br />Address Sf O L� �►�Ui��� CItYTU L 0 [_k ZIP <br />Phone No4j-- o't� <br />EPA DD# (if transported to a permitted TSD facility) <br />9. Is the sampling firm an independent third party from the contractor? YES RI-I"N0 ( ] <br />9a. Describe, in detail, how the soil and/or water sample(s)beneath the tank and piping will be obtained: <br />7. L l Z i-: cu( tai u C 1-.10.1 i 1,._; .T-4_ (�✓Ne_�� <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />11. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />!> SEI:- u i l ti'j <br />b) What will be the final destination of the excavated stockpile? <br />IJJ I�I� �t� iJr i t-'��,tiJ.� ��'1) •I_'ri t S6.t <br />c) Contaminated Soil Hazardous Waste Hauler. <br />Name j ty ✓'1 1:) 4,- Hauler Registration # �9 �( <br />Address, C_tY City L e ZIP <br />Phone No. ( C Ci <br />EH 23 046 (Revised 10119198) Page 5 <br />