Laserfiche WebLink
03/04/2003 16:13 FROM D 5 DRRGLINE SERU. INC. TO 4683` ' <br />SWRCS, January 2002 <br />5. SECONDARY PIPE JESMlG <br />P.05 <br />Page of <br />Test Method Developed By: Piping Manufactt Industry Stauc%ard'' - Pimfessional Engineer <br />�terer pec*) �- <br />vacuum Hydrostatic <br />Test Method Used: =ecify) <br />Test. Equipment used <br />Pipinp, Run Piping Run : C <br />Egwpnmt Resolution: y <br />Piping Kin A# <br />Piping Run <br />Piping Material: <br />Piping Manufacntrer <br />Piping Diamoter: <br />(4t, <br />r <br />44' + <br />Length of Piping Run: [ j <br />ZOO- <br />2C] UL, <br />2nff <br />Product Stored: o4 <br />Q o <br />Method and location of <br />piping -tura isolation: <br />i <br />Wait time between applying <br />pre5=e;Nacuum/water and <br />starting test <br />NQ rti.y� <br />Test Start Time: 45 <br />ys <br />4sr <br />�{s <br />initial Reading (it„I): 5 s <br />i s s) <br />s i ! <br />S s'► <br />Test End 'Time - <br />Final Reading (RF): <br />Test Duration: <br />CLauge in Reading (RF-Rl): <br />Pass/Fail Threshold or <br />Criteria: <br />Air, <br />Pa -Fix, <br />Fail <br />Comments — (include information on repairs made prior to resting, and recommender) fblkat up for failed res,,;) <br />