Laserfiche WebLink
CITY OF TRACY <br /> ENGINEERING DIVISION <br /> GRADING PERMIT FEE CALCULATION SHEET <br /> PROJECT G F T t IU (D 11-1.4 A lc,-7 DEVELOPER 5'471V,41&1 s 1N 6A y <br /> LOCATION -5-74 W �'-r AlyT c 1 ti t fy DATE 10 - Z1 - 'f9 <br /> EARTHWORK QUANTITY PER ROUGH GRADING PLAN <br /> PLAN CHECKING FEE: (Acct. No. 112-4331-403) $ <br /> $40 up to 10,000 cubic yards $ <br /> Additional $40 for each 10,000 cubic yards or fraction <br /> up to 100,000 cubic yards. $ <br /> Additional $30 for each 10,000 cubic yards or fraction <br /> up to 200,000 cubic yards. $ <br /> Additional $25 for each 10,000 cubic yards or fraction <br /> beyond 200,000 cubic yards. $ <br /> GRADING PERMIT FEE: (Acct. No. 112-4331-403) $ - -- <br /> $100.00 for five or less units $ <br /> $500.00 for subdivisions $ <br /> TOTAL $ /`/� <br /> Grading Permit Fee <br />