Laserfiche WebLink
Monitcri.ng System Certinca tion <br /> Site Address: —7r` ""� � - <br /> Date of b <br /> Testing/Servicin P <br /> g. <br /> ( F. In-Tank Gauging/SIR Equipment: ©'Clieck this box if tankaur= <br /> g ,ing is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> OLIYes <br /> ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ No* Was accuracy of system product level readings tested? <br /> '❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> U"'Yes I ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> Ll N/A (Check all that apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> ❑ YesJ_Pr-rq`o*_j Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes I ❑ No* IWas the testing apparatus properly calibrated? <br /> ❑ Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> OJ'Fl%A..� , <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> [a_T, or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does [lie turbine automatically shut off if any portion of the monitoring system <br /> O'"N%A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> -©""IJP/A <br /> ❑'Yes ❑ No* Were all itenis on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: (7 27 <br />