My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
COMPLIANCE INFO 1999 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 4:42:14 PM
Creation date
10/26/2018 3:21:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1999 - 2007
FileName_PostFix
1999 - 2007
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ACDEH,August 2003 Page— OI <br /> _ 5. SECONDARY PIPE TESTING <br /> Test Method Developed Bv: 0 Piping Manufacturer us Standard d ❑Professional Engineer <br /> Other(Sped) <br /> Test Method Used: essure <br /> ❑Vacuum C Hydrostatic <br /> 0 Other(Sped) <br /> Test Equipment Used: Q Equipment Resolution: <br /> Piping <br /> Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: - <br /> /�s>= <br /> Piping Manufacturer. <br /> Zi/G"Gtn,r�..r�,�,7• i1/�-GV.,y+Tiy <br /> Piping Diameter. <br /> Length of piping Run. 0 oZ �r o7 <br /> Product Stored: <br /> Method and location of e2 8 <br /> i in -run isolation: ` � '� �c�sT ;;Zr <br /> Wait time between applying <br /> Pressure/vacuum/water and 5,-*'j.?,.4-.0 <br /> starting test: <br /> Test Start Time: ,o-y <br /> Initial Reading(RO: <br /> Test End Time: ,o�y <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: �! <br /> Test Results ❑Fail <br /> ass ❑Fail ass 0 Fail P-Tass 0 Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow- for failed tests) <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.