Laserfiche WebLink
ACDEH,August 2003 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard ofessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure 0 Vacuumdrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:In-Con TS-STS�ti �s� T—FS�S ,�, Equipment Resolution: <br /> Sump#-,1— g/ Sump#oZ Sump# Sump <br /> Sump Diameter: P <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Depth of Sump Tested <br /> Does turbine shut down when �' <br /> sump sensor detects liquid(both 2- es ❑No 0 NA ❑No ❑NA 0 Yes ❑No ❑NA ❑Yes ❑No 0 NA <br /> product and water)?` <br /> Turbine shutdown response time 3 3as <br /> Is system programmed for fail-safe —-_ / <br /> shutdown?* des ❑No ❑NA [mss ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No 0 NA <br /> Was fail-safe verified to be <br /> operational?* es 0 No ❑NA es ❑No ❑NA ❑Yes 0 No ❑NA ❑Yes 0 No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> .313 JT1549- <br /> SC1.3� <br /> Test End Time: ��;c3�/�►-� ,,y,y <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R): s 95 <br /> Pass/Fail Threshold or Criteria: 2�, <br /> Test Result: ❑ Pas ail s ❑Fail ❑ Pass 11 Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? es 0 No ❑NA es 0 No 0 NA 0 Yes_ONo 0 NA 0 Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? es ❑No 0 NA 1Y es ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes 0 No 0 NA <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for ailed tests) <br /> �� �i�y,O /moi •/«-0 <br />