My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:06:00 PM
Creation date
10/26/2018 3:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: LARRY SHEPHERD To: Steve Sassan Date: 7/21199 Time: 8:28:38 AM <br />07/20/99 1S: 83 FAI 310 985 2380 CE DEPT CSMB <br />MEMORANDUM <br />TO: Larry Shcpard <br />C.L. Bryant <br />FROM: I mh plecnik <br />Consultant <br />1890 San Anseline <br />Lang $etuch, CA 90815 <br />(552) 985-4406 �. <br />DATE: .Poly 201, 1999 "'r <br />SUBJECT: Inspection of a Fiberglass Tank in Tracey, California, Which May .Have Minor <br />Cracking ofthe Primary Shell, on duly 22, 1999 <br />Awed on past inspection of tan with these types of problems, and theoretical <br />calculations fow prea sure applied in the annulus region only, the inos.1 likely damage is <br />circumferential cracking at the rib locations and localized cracking at the lacation of'Ihe nodes. <br />Hence, the purpose of the inspection will be to deterpine the type of cracking patterns and their <br />extern over the surface area of the primary tank. Based on this inspection, recommendations will <br />be provided As tip the feasibility and mature of the repair process. <br />Page 3 of 7 <br />Z01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.