Laserfiche WebLink
From: LARRY SHEPHERD To: Steve Sasson Date: MOW rime: 3:58:14 PM Page 14 of 16 <br />requirements of section 25281 chapter 6.7 of the California Health and <br />safety plan. Joe will be doing the final inspection of the tank. <br />15.0 Tank Warr ani) <br />Containment Solutions will be doing the repairs that Joe Plecnik will be <br />concluding that needs to be done. The repairs that will be done will covered <br />under the warranty of the tank. The tank manufacturer will offer this <br />warranty and certify that the tank meets all Underwriters laboratory Listing <br />requirements. <br />16.0 Tank 6Ienting <br />The vapor lines of the two tanks are tied together. The vapor lines <br />have an extractor plug between the tanks. The extractor plug was put in <br />when the tank was being prepared for entry. Once the repairs to the tank are <br />completed this plug will be removed to allow the system to work properly. <br />During the operation the LEL levels will be kept at or below 10% with these <br />plugs in place. <br />17.0 Re -tasting <br />Once the tanks have been repaired and all the vapor lines re- <br />installed the proper testing will be done. The test will be conducted by San <br />Joaquin Valley APCD prior to calling for final inspection of operating <br />permit. <br />