My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:06:00 PM
Creation date
10/26/2018 3:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: LARRY SHEPHERD To: Steve Sasson Date: MOW rime: 3:58:14 PM Page 14 of 16 <br />requirements of section 25281 chapter 6.7 of the California Health and <br />safety plan. Joe will be doing the final inspection of the tank. <br />15.0 Tank Warr ani) <br />Containment Solutions will be doing the repairs that Joe Plecnik will be <br />concluding that needs to be done. The repairs that will be done will covered <br />under the warranty of the tank. The tank manufacturer will offer this <br />warranty and certify that the tank meets all Underwriters laboratory Listing <br />requirements. <br />16.0 Tank 6Ienting <br />The vapor lines of the two tanks are tied together. The vapor lines <br />have an extractor plug between the tanks. The extractor plug was put in <br />when the tank was being prepared for entry. Once the repairs to the tank are <br />completed this plug will be removed to allow the system to work properly. <br />During the operation the LEL levels will be kept at or below 10% with these <br />plugs in place. <br />17.0 Re -tasting <br />Once the tanks have been repaired and all the vapor lines re- <br />installed the proper testing will be done. The test will be conducted by San <br />Joaquin Valley APCD prior to calling for final inspection of operating <br />permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.