My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:30:16 PM
Creation date
10/29/2018 9:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corrosion protection system <br />Please describe the type of corrflSicn protection system you propose to install_ The cathodic protection <br />system retrofitted on existing UST systems must be designed by a corrosion specialist certified by the <br />National Association of Corrosion Engineers (NAGE) or by a qualified professional engineer. Metal <br />components of the UST system (i. e_ submersible pumps, piping etc) that routinely Contain fuel and are in <br />contact with the ground must also be cathodicady protected. <br />5_ Certifi bon: (Application will be disapproved without this informaton) <br />Attach detailed information as to the methods used to line the tank and a certification form the manufacturer, <br />or his authorized representative, of the tank lining material's capability to store the proposed hazardous <br />substances. <br />6. Describe the monitoring performance standard you propose to use after the lining/ repair is complete. <br />7, a. Describe how the hazardous waste generated from the tank lininglrepair will be managed on site. <br />(Note: all hazardous waste stored on site must be managed in accordance with Tipe 22 California <br />Code of Regulations (CCR)). <br />h. Identify the contractor performing the UST decontamination: <br />Name 16 Phone: <br />Address City Zip <br />C. Residual Fuel Hauler <br />Company Name Ak Phone, _-- <br />Address <br />Transporier's ID*,, <br />I;tr 'd 676VON <br />City _-- Zlp <br />-5991-M -60Z Wdl9:Z, 6661 '1 'unr <br />q <br />T <br />T <br />P <br />M <br />H <br />Z <br />S <br />n <br />M <br />H <br />S <br />Z <br />T <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.