Laserfiche WebLink
Sent by: STRUCTURES LAB,CSULB <br />562 965 4406 <br />r • 06/09/99 12:13 <br />Job 177 Page 3/3 <br />cif about i ,psi (about 8 hour period) on the annular space water is still evident at the lowest point or at the location of ehe elect <br />P on13-. Determine «-hether ��r not <br />water is present at the location of the electronic sensor, a s • runic sensor. it' no <br />conducted per recommendations of -CS to certify the tank. If standard <br />the <br />Pressure test pass, then I believe the tank should be tI f Nord vacuum test shalt e <br />vacuum and the <br />considered acceptable and certifiable. <br />If either the vacuum or pressure test fail in the last part of St 2, the ' <br />the secondary wall is leaking Step n it is evident that <br />my opinion that the locationf this cracked secondarthe annular y walla io on <br />Pa <br />experience, it is <br />determine, even with the use of helium or other t n is difficult to <br />the concrete slab has been S pes of tracing gases, especially when <br />Poured over the tank_ If no other procedure is feasible in <br />determining Whether or not the Seco <br />the tank be removed from the o ndary shelf is leaking, I would then recommend that <br />be employed to determine the location <br />atti n of the leakage nd and the aolloiwe ores recommended by ('S <br />Procedures outlined by CS. b3' repair, utilizing the <br />4- To pressurize the annular region alone requires considerable care, to avoid damage to the <br />tanks. It is, therefore. recommended to pressurize therim <br />ri p �]' tank, bleed into the annular <br />region, then remove the pressure from the P maty mak• While removing the pressure <br />from the <br />Primary tank, the valve to the annular space should be closed. It is possible that <br />the pressure in the annular space will drop significantly after the primary tank has been <br />depressurized, due to the elastic deformations of the primary shell. Therefore, this <br />process may have to be repeated several times, to attain a reasonable pressure of about 3 <br />psi in tie annular region only. The pressure in the primary tank should be the maximum <br />prcb'bed by CS for such a testing procedure. <br />If you have any questions, please call me at (562) 985-4406. <br />