Laserfiche WebLink
061,11/1.999 18: E0 7077451.477 01 -:IH PAGE 0111 <br />Supplementary Checklist <br />Coridalnment Solutions UST Joh <br />Tracy, Calffomia <br />June 1999 <br />Date: <br />Reviewed By: <br />_- Containment Solutions training records checked <br />Review Site Satiety Wan with workers — MSDS Reviewed Review of hospital we <br />Review Containment Solutions Tank Entry Policy (211191) <br />Tank 2ndry space/Water Fil€edittential Flanrriable Atmosphere <br />5Q' Exclusion ZoneM"ng & Caution signs posted <br />One tank at a time (CUPA, pg, 4)INo fire! drop off atlowed during tank entry <br />_ Title S Compliance <br />No pipelines hooked up to tar*: verily all disconnects (vapor recovery) <br />No electrical power to tank; verify all disconnects <br />Airline Compressor Check: <br />High temp alarm _T Hydrocarbon filters <br />CO alarm functional CO meter catibration date <br />10 min air supply bottle <br />— Mechanical ventilation being used to ventilate tank <br />_ All electrical equipment grounded, insulated and GFCI used as appropriate <br />No sources of ignition within 54' <br />Manway 36° x 36" <br />Good Housekeeping <br />Attendant FAICPR Trained (Containment Solutions Policy) <br />_ Air -Powered mechanical tools (Service Field Manual) <br />_ Eyewash Fire Extinguisher _ First Aid Kit <br />