My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:30:16 PM
Creation date
10/29/2018 9:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 2? '99 15:13 FR CONTAINMENT SOLUT I ONS814 542 50zo TO 9-12095371565 <br />1 814 942 6020 <br />5. No fuel deliveries can be tirade to any tank oia site while technician is inside a tank, <br />P. 03120 <br />6. When tank entry is required by the Technician, a person trained in CPR must be beside <br />the entry hale at all times when the Technician is inside the tank_ This person is in addition <br />to the safety person. If one is not available from the contracting crew, an off duty firernan, <br />nurse, EMT, or equivalent is acceptable. Besides administering CPR; the person will assist <br />the safety person should an emergency rescue be required, <br />7. Our Technician will perform an airlsoap tigtr°necs test confirming his repairs to the <br />exterior of tank, and possibly identify any other potential problems on the exposed areas of <br />the tank. All efforts must be made to isolate, dkconnect, or plug all the piping on tank, If <br />this test is done, and at a later date another pro'Aem with the tank is identified, it will be the <br />financial responsibility of the owner or contractor to schedule a return trip to the site. <br />8, it is important That the contractor or owner contact the appropriate local and state <br />authorities for regulations concerning the jobsite. Jobsite permits may neod to be obtained <br />for the excavation or remanuficture of the tank. Regulations governing testing of <br />underground tanks should be determined so Technician can be advised. <br />9. The contractor must disconnect the electrical supply and remove, the pump from the <br />tank. The product lime at the pump must also b<; disconnected or rapped, TWs will insure <br />no fitel can enter the tank while Technician is working. <br />10. The water table in the tank hole must be controlled at all times_ The Technician is <br />unable to remanufactur interior or exterior sutf-wCs if thev are wet. Controlling the water <br />table will also prevent the tank from floating. <br />I L Tanks to be cratered, must be triple rinsed and defurraed prior to technician's arrival. <br />Page 2 of 3 <br />Recieved Time May -27. 10.69AM <br />81A, 'd 000 ON 9901-M -60Z..-NV89:6 6661 'Z 'uni' <br />
The URL can be used to link to this page
Your browser does not support the video tag.