Laserfiche WebLink
MAY 27 '99 15:16 FR CONTAINMENT 9GLl1TION5814 542 5W0 TO 9-12995371565 P.14/28 <br />1 814 542 5020 <br />section <br />bulletin <br />date ./%92 <br />page 6 of 6 <br />Remov¢ all equipmant. Double. check to ensure that all caps used to <br />Plus pipes aro removed. sign $ntrg Permit and include virh the field <br />trip report documsnts. <br />froesd=ft for External g.rk <br />If the . repair work involves cutting into a tank, or grinding adjacent to a <br />.crack or split that extends throU& the shall wall, prior to any voik the <br />-tank aust be ventilated such that the vapor laval is less than lot LEL <br />Initially and remains lower alae 20% of the LEL during work. Tanks that <br />havebeen in sezvi" .are to be continuously monitored to ensure thiese <br />condi.tiova are met. <br />The above requirements must be met for field Installation of fittings. <br />a:saf3. <br />Recieved Time MaY 2I, I0 59AM <br />81/7,1 'd000110N 9991 -L£9 -60r NVLq: 6 6661 'Z 'unr <br />