My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:30:16 PM
Creation date
10/29/2018 9:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1999
FileName_PostFix
1999
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L &-28--1599 d : 38PI-1 F Rml <br />F3, l u • :: - a1llil►�i <br />Date: June 29, 1999 <br />Ta Robert S4, -r, D and S lir agline 2.09 826 8699 <br />Cc: Larry Sbeppahad, CL Bryant 209556-5036 <br />RE: Tank 508444 and Tank XW5 <br />Tracy Gee arhd Go <br />574 W Grant )Cine Road <br />Trac} CA <br />URI <br />RECEIVED <br />JUN :3 0 1999 <br />ENVIRONMENTAL HEALTH <br />PERMIT / SERVICES <br />I received a work plant from Lsury Sheppard at 11:30 on )uta 29, 1999. I have performed a <br />preliminary review of your site s 6etety plan which indlhdes a section entitled "scope of <br />opft-mons". In summary you have proposed that you will replace the 15,000 gallon USI" <br />withh an identical UST. You have also propsed that the 10,000 gallon UST which is currently <br />out of round will be relieved of back fill pr+essuze and measured for roundness. If it remmis <br />to round (i.e. r+epsired) it will be returned to the excawti n_ If it the 4eflection zearains <br />greater thin that which is accepted by the factory then a new UST wall be is� <br />f' lease be awge arae PHS/EHD policy 94-009 s=es that maxiam tame for a prelinlivas <br />review is 24 worl6r days stud nuxitnum time for Q full review is 40 working days. ' Mis <br />preliminary review is net to be corL idered by you as complete res iew. Under the conditions <br />of the repair permit section 5you num "Attadl detAedinforrcwtion as to raethods used to <br />line/repair the t mk-.- " The dttas7ed infomnarioo or repssir work plan must be signed and <br />submitted by the hoensed contractor. Subatittals troth non -licensed slab contractors will not <br />be appmved by PIIS/RHD, <br />Tile follawhrhg 1s a list of issues thea are not addrmt"'d in "Suction 3.G Scope of Opl>. ns" <br />contained in your site safety pl= lfbEse issues need to be addressed and the work plan <br />approved prior to sche&ding asry appointments at the sits: <br />1) AR ved UST's si D I tratnaported to ia Licensed tneamem or asposal f�c;lity. /Df <br />T'lexte <br />the on of the USI's. The treatment or disposal facility musrd <br />sub a. to EHD statng that it received the UST. <br />2} mahnd r>aed sa inerrthciathlcs is tat specaf'red m e6e worir plan 14,t? <br />l�. <br />3} <br />se brehit the I7ISC Tanis Gloslxre Certification Form to the inspector oil si <br />prior:oTal <br />oval of either UST. <br />f} A r ermitor approval for the removal from Trac?r Fire Department must be <br />pr*vided with the -work plan. t,, <br />LID Z -Zed WV 9£ 1 DOL awil 66/OM :aged NOSSVS 3A31S :Dl (383Hd3HS ),�JNV-1 woJ-� <br />
The URL can be used to link to this page
Your browser does not support the video tag.