Laserfiche WebLink
oaryEl,.tAy <,InE I. -JAI UTALDC. _ <br />—' LMIDS[APIAIG - <br />LAND5C nlI6jA <br />8 ) <br />I - I <br />I <br />tx1sr, 2 -um p 447 I '� <br />k E-XtST.yecog/aooT C.I' <br />MBNI-MOIz <br />gj sumf u <br />87 Stam -p -, y w - <br />i�_G2allN� O; - <br />;TORA,_45- 7AN /S6 <br />N <br />SITE PLAN <br />N -r S <br />aW Nn�F���d <br />OWNER: SOOD CORPORATION <br />TEL: 209-833-3416 <br />— -cR-ly N -_E <br />PROJECT SCOPE OF WORK & NOTES <br />1. UPGRADE PRIAIERY FUEL LINES <br />REPLACE EXISTING SINGLE WALL FLEX FUEL LINES WITH <br />1 %"NEW WESTERN FIBERGLASS CO -FLEX DOUBLE WALL <br />PIPES AS PER MAUFACTURER SPECIFICATIONS AND AS <br />DETAILED BELOW. <br />(s) LINE # 1 GRADE 91 FROM 91 SUMP TO PUMP # 1-2 <br />(b) LINE # 2 GRADE 91 FROM 91 SUMP TO PUMP # 3-4 <br />(c) LINE # 3 GRADE 87 FROM 87 SUMP TO PUMP # 1-2 <br />(d) LINE # 4 GRADE 87 FROM 87 SUMP TO PUMP # 34 <br />(e) LINE # 5 GRADE 91 FROM PUMP # 1-2 TO PUMP # 5-6 <br />(f) LINE # 6 GRADE 87 FROM PUMP # 1-2 TO PUMP # 5-6 <br />(g) LINE # 7 GRADE 91 FROM PUMP # 34 TO PUMP # 7-8 <br />(h) LINE # 8 GRADE 87 FROM PUMP # 3.4 TO PUMP # 7-8 <br />2. INSTALL I.S.D. <br />INSTALLS IN STATION DIOGNOTIC (I.S.D) <br />SYSTEM AS DETAILED BELOW <br />(a) INSTALL VEEDER ROOT SOFTWARE ENHANCEMENT <br />MODULE. <br />(b) INSTALL VST VAPOR FLOW SENSORS <br />(c) INSTALL PASSPORT DISPENSER INTERFACE MODULE. ' <br />(d) INSTALL GENDER MENDER FOR PASSPORT WITH ISD <br />FINISH NOTES <br />1. PERFORM VEEDER ROOT MONITOR CERTIFICATION TEST. <br />2. . PERFORM SECONDERY CONTAINMENT TEST FOR TANKS <br />AND FUEL LINES <br />3. PERFORM OPERATABILITY TESTS FOR ALL THE <br />SOFTWARE AND HARDWARE INSTALLED. <br />REPLACEMENT OF PRIMERY FUEL LINES <br />AND <br />INSTALLATION OF I.S.D. <br />A -ONE GAS &s FOOD <br />574 WEST GRANTLINE RD. <br />TRACY CA 95376 <br />CONTRACTOR: FAHY CONSTRUCTION CO.PACHECO CA 94553 <br />TEL 925-998-6552 <br />HC. # 477315 <br />