Laserfiche WebLink
COMPANY. <br />A -One Gas <br />DATE OF QUOTATION QUOTE NUMBER <br />08/18/10 ELC96-1001 <br />PROJECT Veeder Root ISD <br />QUANTITY <br />DESCRIPTION <br />UNIT PRICE EXTENDED <br />VEEDER ROOT ISD For Sites With Canister & PMC Only Existing <br />$ - <br />1 <br />VEEDER-ROOT 330160-004 SEM Software Enhancement Module <br />$ 2,222.10 $ 2,222.10 <br />4 <br />VEEDER-ROOT 330020-585 Balance VST Vapor Flow Sensor - 1 per disp required <br />$ 937.80 $ 3,751.20 <br />1 <br />VEEDER-ROOT 330280-401 G-Site/Passport Dispenser Interface Module (DIM) <br />$ 885.56 $ 885.56 <br />1 <br />VEEDER-ROOT 331063-025 G -Site 25' cable to TLS350R & Installation Manual <br />$ 62.10 $ 62.10 <br />1 <br />GILBARCO Q13180-20 Gender Mender Required For Passport w/ ISD In California <br />$ 7.50 $ 7.50 <br />1 <br />VEEDER-ROOT Factory freight <br />$ 85.00 $ 85.00 <br />Fuel Surcharges- Many factories are now adding on fuel surcharges to cover the high cost <br />of fuel. Currently Gilbarco and Gasboy have implemented fuel surcharges. NWP expects <br />many other factories to follow. NWP will have to pass these charges on. Please be aware <br />that your final bill will include any fuel surcharges that NWP has to pay. <br />Above Specifications Exclude the Following (Unless Otherwise Noted): <br />Plans, Permits, Inspection, All Testing, Labor to Assemble or Install, Miscellaneous Pipe Fittings <br />and Accessories, Any Electrical Consideration, Offloading or Setting Any Equipment or Tank, Site <br />Improvements, Guard Barriers, Any Other Items (s) Not Specifically Mentioned Above <br />Equipment Only: No Installation. Subject to engineer's approval. This quotation does not include <br />or imply any equipment or quantities other than listed herein. Contractor to determine actual <br />quantities required. No retainage to apply. <br />Performance: Performance of equipment listed is based upon the accuracy of the information <br />supplied to NW Pump and Equipment Co. by the customer or customer's engineer. Guarantee of <br />performance may require approval by a licensed engineer at the customer' <br />Page 2 of 2 <br />Northwest Pump Equipment Co. <br />