Laserfiche WebLink
EXHIBIT - A <br />SCOPE OF WORK <br />1. Install VeederRoot 861290-002 Carbon Pressure Management System on <br />existing vent risers. <br />2. Manifold both vent risers to the system <br />3. Install Veeder Root 330020-515 ISD Vapor Pressure Sensor <br />4. Install Veeder Root 331500-358 ECPU2and version 29 Software W/ <br />NVMEM2 old ECPU Board. <br />5. Install Husky 5885 2" Pressure Vacuum Vent (EVR Carb Approved) <br />6. Install 8 VST VSTA-EVR -012-12" Coaxial whip hose <br />7. Install 8 VST VDV-EVR-096-8' coaxial hose w/Venturi. <br />8. Install 8 VST VST-EVR-SBK-coaxial EVR Breakaway w/check valve. <br />9. Install 8 VST VST-EVR-NBBL coaxial EVR Balance Nozzles <br />Ramesh Sood 02/23/2009. <br />A -One Gas & Food <br />Owner Operator <br />574 West Grant line Rd. <br />Tracy CA 95376 <br />