Laserfiche WebLink
In -Tank- Gauging / SJR Equipment; 4% Check this box if rank gauging is used only fol, inventory control. <br />❑ C12eLiC thl5 box if no tanl; guugigg or SM CL141pMent is tmstalIr <br />This section 2aust be completed if in-tatalc gauging equipment is used to poxform Joni; detection monitoring_ <br />Coca m leve the foltowili� checklist: <br />Yes ❑ Noy H4j all input wiring bean inspcctcd for proper envy and trrminati <br />n on inCludinz testing for grniinri fauLtsY <br />Yes U Alo* W cr: Al! tank gnu�ing probes visually i�aspected for damage and residue. buiidu 7 <br />❑ Yes ❑ No" Was accuracy of system product level readings tcstL,d'? F <br />l"3 Ye.s ❑ No'" Was accuracy of system water lrvrl readinge zaaz ? <br />❑ Yes C] No* Warc all probes reinstalled properly? <br />❑Yes CJ No' Were all items on the equipment manufacturer's ,•naintenanea cheeklicr co,vllcced? <br />In the 5ectipn H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors {LLD); C� Chick oris boa it LLDs are not installed. <br />Ralete the folio iag checklist: <br />Yes C1 No* For equipment starT-up or annual equiprrrenr certification, was a leai* simulated to verify LL17 performance? <br />❑ N/A (Check al? char appy)) Sinutlawd leak rate,: 3 g,p.h., ❑ 0.1 a.p_h ; ❑ 0.2 o_p_h. <br />L$ Yes Q No" 1 Were nil r r tis eonfiralod operational and accurate within regulatory requirerYlents? <br />Yes L7 Noy Was the testing apparatus propzrty calibrated'? <br />Yes La No* For mechanical LI -Ds, does the LLD raStrict Product flow if it detects a leak? <br />Q NIA <br />L7Yes Q No* For eleerronio LLDs, does the turbine aucgmaticdlly shut off i2 the LLD der > <br />N/A ects a leak'. <br />❑ i'e$ ❑ No* For electronic LLDs, does die turbine autumatica"y shut off if any partinn of the monitoring system is disablea <br />J6 NIA ar di5CUn,Uel•LCd? <br />❑ Yes L7 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />,M N/A or fails a test? <br />❑ Yes ❑ No* ,0S N/A For electronic LLDs, ,have all accessible wiring connections been visually inspected? <br />W''rs ❑ No ^ Were All irons on the equipmeril naanttfacrutea's rnaintenanee checklist completed'? <br />rn the Section li, below, desuibe how and when these deficiencies were or will be corrected. <br />ff. Comments-. <br />Page 3 o!' 3 <br />001 <br />90/b0 39dd 0003 Sd9 3N0 d 9L9LC6860Z E5:80 8002/LZ/0Z <br />