My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:06:01 AM
Creation date
10/29/2018 11:24:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2008 - 2011
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> F. In-Tank Gauging/SIR Equipment: I Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> RE] Yes <br /> WNo* Were <br /> all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> e all tank gauging probes visually inspected for <br /> damage and residue buildup? <br /> accuracy of system product level readings tested? <br /> accuracy of system water level readings tested? <br /> all probes reinstalled properly? <br /> all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section K below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com tete the folin checklist: <br /> YesFEINo'*OwWas <br /> For equipment start-up or annual equipme t certification, was a leak simulated to verify LLD performance? <br /> (Check all that apply) Simulated leak rate: 3 g.p.h.; 110.1 g.p.h; ❑0.2 g.p.h. <br /> AYesWere all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes the testing apparatus properly calibrated? <br /> A Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 40 N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ Yes No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 4 <br /> UN-036—5/6 <br /> www.unidomorg <br /> Rev.01/17/69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.