Laserfiche WebLink
Monitoring System Certification <br /> F. In-Tank Gauging/SIR Equipment: I Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> RE] Yes <br /> WNo* Were <br /> all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> e all tank gauging probes visually inspected for <br /> damage and residue buildup? <br /> accuracy of system product level readings tested? <br /> accuracy of system water level readings tested? <br /> all probes reinstalled properly? <br /> all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section K below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com tete the folin checklist: <br /> YesFEINo'*OwWas <br /> For equipment start-up or annual equipme t certification, was a leak simulated to verify LLD performance? <br /> (Check all that apply) Simulated leak rate: 3 g.p.h.; 110.1 g.p.h; ❑0.2 g.p.h. <br /> AYesWere all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes the testing apparatus properly calibrated? <br /> A Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 40 N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ Yes No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 4 <br /> UN-036—5/6 <br /> www.unidomorg <br /> Rev.01/17/69 <br />