Laserfiche WebLink
Test Method Developed By: <br />Page 2 of 8 <br />2. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />❑ Sump Manufacturer © Industry Standard <br />❑ Other (Specify) <br />❑ Other (Specify) <br />❑ Professional Engineer <br />11 Test Equipment Used: INCON STS I Equipment Resolution: +/- 0.002" <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />* Test was done for post repair work testing; not an actual SB -989 Test. <br />** UDC 3/4 was tested on 05/01/2008 <br />*** UDC 1/2, 5/6, 7/8 were tested on 05/15/2008 <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />uDC # 1/2 UDC # 3/4 <br />UDC # 5/6 UDC # 7/8 <br />UDC Manufacturer: <br />Unknown <br />Unknown <br />Unknown <br />Unknown <br />UDC Material: <br />Poly <br />Poly <br />Poly <br />Poly <br />UDC Depth: <br />28" <br />28" <br />28" <br />28" <br />Height from UDC Bottom to Top of <br />Highest Piping Penetration: <br />10" <br />10" <br />10" <br />10" <br />Height from UDC Bottom to Lowest <br />Electrical Penetration: <br />4" <br />4" <br />4" <br />4" <br />Condition of UDC prior to testing: <br />Dry <br />Dry <br />Dry <br />Dry <br />Portion of UDC Tested' <br />2" Above <br />Penetration <br />2" Above <br />Penetration <br />2" Above <br />Penetration <br />2" Above <br />Penetration <br />Does turbine shut down when UDC <br />sensor detects liquid (both product <br />and water?' <br />❑ Yes ❑ NO ® NA <br />❑ Yes ❑ No ❑x NA <br />❑ Yes ❑ No ❑O NA <br />❑ Yes ❑ No ® NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />shutdown?' <br />❑ Yes ❑ No O NA <br />❑ Yes ❑ No ❑x NA <br />❑ Yes ❑ No ❑x NA <br />❑ Yes ❑ No O NA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No IM NA <br />❑ Yes ❑ No ❑x NA <br />❑ Yes ❑ No IM NA <br />❑ Yes ❑ No ® NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test <br />10 min <br />10 min <br />10 min <br />10 min <br />Test Start Time: <br />12:39 PM <br />2:36 PM <br />02:06 PM <br />12:39 PM <br />Initial Reading (Ri): <br />5.216" <br />0.444" <br />4.980" <br />5.048" <br />Test End Time: <br />12:54 PM <br />2:51 PM <br />02:21 PM <br />12:54 PM <br />Final Reading RF): <br />5.216" <br />0.444" <br />4.967" <br />5.048" <br />Test Duration: <br />15 min <br />15 min <br />15 min <br />15 min <br />Change in Reading (RF-Ri): <br />0.000" <br />0.000" <br />-0.013" <br />0.000" <br />Pass/Fail Threshold or Criteria <br />Test Result: <br />+/- 0.002" <br />21 Pass ❑ Fail <br />+/- 0.002" <br />❑O Pass ❑ Fail <br />+!- 0.002" <br />❑ Pass 21 Fail <br />+/- 0.002" <br />10 Pass ❑ Fail <br />Was sensor removed for testing? <br />O Yes ❑ No ❑ NA <br />El Yes ❑ No ❑ NA <br />O Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />Was sensor properly replaced after <br />testing? <br />px Yes ❑ No ❑ NA <br />IM Yes ❑ No ❑ NA <br />O Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />* Test was done for post repair work testing; not an actual SB -989 Test. <br />** UDC 3/4 was tested on 05/01/2008 <br />*** UDC 1/2, 5/6, 7/8 were tested on 05/15/2008 <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />