Laserfiche WebLink
5. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? <br />b. Identify contractor performing decontamination: <br />Name <br />Address <br />c. Describe method to be used for decontamination: <br />YES [ ] <br />N, -- <br />NO[] <br />Phone (_) <br />_ City Zip <br />d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br />e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br />Hauler Name Phone (� <br />Address <br />Permitted Disposal Site <br />6. a. Describe the method that will be utilized to purge and/or inert the piping: <br />Hauler Reg# _ <br />City Zip <br />b. Piping Hauler: <br />Name <br />Phone () <br />Address <br />City zip. <br />Hauler Registration # (if hauled as hazardous) <br />c. Piping Disposal Site: <br />Name <br />Phone (_) <br />Address <br />City _Zip_ <br />EPA ID# (if transported to a permitted TSD facility) <br />7. Is the sampling firm an independent third party from the contractor? <br />a. Identify sampling firm: y <br />Name ( <br />YES [ ] NO [ ] <br />Phone( <br />Address <br />City <br />b. Identify laboratory performing analysis: <br />Name <br />Phone �) <br />Address <br />City <br />8. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be obtained: <br />r4,A <br />Zip <br />9. a. Handling of excavated soil (Contaminated Soil Hazardous Waste Hauler): IQ <br />Name Hauler Registration # Phone (� <br />Address City Zip, <br />b. If soil is not to be hauled, describe what will be done with it: <br />3 <br />Zip <br />