Laserfiche WebLink
COMFANY: <br />A -ONE GAS <br />DATE OF QUOTATION <br />07/22/10 <br />QUOTE NUMBER <br />ELC94-10 <br />PROJECT Western Fiberglass Piping <br />QUANTITY I <br />DESCRIPTION <br />I UNIT PRICE <br />EXTENDED <br />170 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />WESTERN FIBERGLASS <br />WESTERN FIBERGLASS P14500 1.5 CO -FLEX PIPE 40'& 30' LENGTHS <br />WESTERN FIBERGLASS P14580C Pipe End- 1.5", Male Non -Swivel w/Two Clamps <br />WESTERN FIBERGLASS P14636U Test Assembly- 1.5", Urethane <br />WESTERN FIBERGLASS PI4773 Pipe Stripper- 1.5" <br />WESTERN FIBERGLASS P14780 Pipe Cutter <br />WESTERN FIBERGLASS DWAC4500 Bonder- Co -Flex Fittings <br />WESTERN FIBERGLASS DWAC450OG Installation Gun- For DWAC4500 <br />WESTERN FIBERGLASS SWCUFF2.OF <br />WESTERN FIBERGLASS AC8007 Sump Bond Kit- Single <br />WESTERN FIBERGLASS DWAC600 Bulkhead Adhesive- Tube + Mixing Tip <br />WESTERN FIBERGLASS DWAC601 Adhesive Applicator Gun - <br />WESTERN FIBERGLASS P14636U Test Assembly- 1.5", Urethane <br />Fuel Surcharges- Many factories are now adding on fuel surcharges to cover the high cost <br />of fuel. Currently Gilbarco and Gasboy have implemented fuel surcharges. NWP expects <br />many other factories to follow. NWP will have to pass these charges on. Please be aware <br />that your final bill will include any fuel surcharges that NWP has to pay. <br />Above Specifications Exclude the Following (Unless Otherwise Noted): <br />Plans, Permits, Inspection, All Testing, Labor to Assemble or Install, Miscellaneous Pipe Fittings <br />and Accessories, Any Electrical Consideration, Offloading or Setting Any Equipment or Tank, Site <br />Improvements, Guard Barriers, Any Other Items (s) Not Specifically Mentioned Above <br />Equipment Only: No Installation. Subject to engineer's approval. This quotation does not include <br />or imply any equipment or quantities other than listed herein. Contractor to determine actual <br />quantities required. No retainage to apply. <br />Performance: Performance of equipment listed is based upon the accuracy of the information <br />supplied to NW Pump and Equipment Co. by the customer or customer's engineer. Guarantee of <br />performance may require approval by a licensed engineer at the customer' <br />23.42 <br />48.00 <br />50.00 <br />200.00 <br />177.14 <br />130.00 <br />500.00 <br />180.00 <br />121.00 <br />135.00 <br />500.00 <br />50.00 <br />$ 3,981.40 <br />$ 192.00 <br />$ 200.00 <br />$ 200.00 <br />$ 177.14 <br />$ 130.00 <br />$ 500.00 <br />$ 720.00 <br />$ 121.00 <br />$ 135.00 <br />$ 500.00 <br />$ 50.00 <br />