Laserfiche WebLink
COMPANY: <br />A -ONE GAS <br />DATE OF QUOTATION <br />QUOTE NUMBER <br />PROJECT <br />Western Fiberglass Piping <br />07/22/10 <br />ELC94-1001 <br />QUANTITY <br />DESCRIPTION <br />UNIT PRICE <br />EXTENDED <br />270 <br />4 <br />8 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />16 <br />2 <br />1 <br />WESTERN FIBERGLASS <br />WESTERN FIBERGLASS P14500 1.5 CO -FLEX PIPE <br />WESTERN FIBERGLASS P14580C Pipe End- 1.5", Male Non -Swivel w/Two Clamps <br />WESTERN FIBERGLASS P14636U Test Assembly- 1.5", Urethane <br />WESTERN FIBERGLASS P14773 -R Pipe Stripper -1.5" Rental <br />WESTERN FIBERGLASS P14780 -R Pipe Cutter Rental <br />WESTERN FIBERGLASS DWAC4500 Bonder- Co -Flex Fittings <br />WESTERN FIBERGLASS DWAC450OG-R Installation Gun- For DWAC4500 Rental <br />WESTERN FIBERGLASS P14644 Tee- 1.5", Barb x Barb x NPT w/Four Clamps <br />WESTERN FIBERGLASS P14633U 1.5 Crossover Assy. -Urethane <br />WESTERN FIBERGLASS ACRB1061 Repair Boot -Total Containment 2.0 <br />WESTERN FIBERGLASS DWAC600 Bulkhead Adhesive- Tube + Mixing Tip <br />WESTERN FIBERGLASS DWAC601-R Adhesive Applicator Gun -Rental <br />Fuel Surcharges- Many factories are now adding on fuel surcharges to cover the high cost <br />of fuel. Currently Gilbarco and Gasboy have implemented fuel surcharges. NWP expects <br />many other factories to follow. NWP will have to pass these charges on. Please be aware <br />that your final bill will include any fuel surcharges that NWP has to pay. <br />Above Specifications Exclude the Following (Unless Otherwise Noted): <br />Plans, Permits, Inspection, All Testing, Labor to Assemble or Install, Miscellaneous Pipe Fittings <br />and Accessories, Any Electrical Consideration, Offloading or Setting Any Equipment or Tank, Site <br />Improvements, Guard Barriers, Any Other Items (s) Not Specifically Mentioned Above <br />Equipment Only: No Installation. Subject to engineer's approval. This quotation does not include <br />or imply any equipment or quantities other than listed herein. Contractor to determine actual <br />quantities required. No retainage to apply. <br />Performance: Performance of equipment listed is based upon the accuracy of the information <br />supplied to NW Pump and Equipment Co. by the customer or customer's engineer. Guarantee of <br />performance may require approval by a licensed engineer at the customer' <br />23.43 <br />48.00 <br />50.00 <br />43.00 <br />43.00 <br />130.00 <br />75.00 <br />115.00 <br />66.00 <br />357.15 <br />135.00 <br />75.00 <br />$ 6,326.10 <br />$ 192.00 <br />$ 400.00 <br />$ 43.00 <br />$ 43.00 <br />$ 130.00 <br />$ 75.00 <br />$ 460.00 <br />$ 264.00 <br />$ 5,714.40 <br />$ 270.00 <br />$ 75.00 <br />