Laserfiche WebLink
ACDEK August 2003 VEP <br />7. CNDER DISPE SER C0jvr17 2013 A MIENT Daae _ of <br />Test Method 1]eveloped By: ❑ UDC Manufacturer CJ Industry <br />D Other (Spec) TH DE eer <br />Test Method Used D Pressure <br />❑ Vacuum <br />Test <br />J Outer (,Spec) HYdrostatiC <br />Equipment Used- In -Con TS -STS, <br />Equipment Resolution <br />UTA-; <br />UDCMaterial: ti-P.l�.r 1A # <br />UDC Total the` 4S l� UI <br />eight from " { C <br />UDC Bottom to Top • <br />of Fii est Pi penetmtion: <br />Leight t T_Mc ,Bottom to ` <br />Lowest Electrical Pcnedadon: (d •, (� <br />Condition of UDC prior to <br />tss C� 1 �C <br />D thof UDC Tested �t k 0 k 1. <br />Does turbine shut daum wkien <br />UDC sensor detects liquid (both Yes q Na JNA <br />duct and water ? . A Yes d No D NA jr Yes J No ❑ NA <br />'turbine shutdown rC a ti= - f Y� ❑ No Q T <br />Is system programmed for fail- <br />safe shutdown?' Yes 0 No D NA Xy- D No Q NA A yes ❑ No D NA Y 11 No p Na <br />wasfail-safe verified to be <br />a erational?` Yes Q No C NA pl yes d No p NA <br />a' tirm betweeu a lY�g Yes D No JNA X Y 0 No CNA <br />Zeta <br />Pressure/vacuum/water and <br />starting test 16 4a� <br />Test Strut Time: <br />Initial Readiu (I); <br />Test End Time: S <br />Final - (g, <br />Test Duration: L <br />Cha in T2eadin (itRt): <br />pass/Fail Threshold or Criteria �" ` E " <br />-d <br />-k <br />Pass <br />Was q;it!ail <br />sensor removed for testing? Qs q Na DNA �y q Ql J <br />Was sensor ro I P NA!'a#Jw, ' <br />P T� Y re laced and �S Yes d No ❑ NA �7, yG, D No DNA b Yes D No CNA WYes 0 No J NA <br />verified fimotional after <br />Q.Yea D No Q NA �lYes <br />Gam, <br />UJ�II�#3 (i►�clr�de Y ornation UNA <br />on re airs made rior to testtn <br />and reconuitended ojjow-u for aired tests <br />6 <br />TT/TT 39yd gOOd SVE) 3N0 y 9L9�,CII 7 6b:bT ETe7/LT/Zi <br />