My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:37:37 AM
Creation date
10/29/2018 2:53:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2011 - 2016
FileName_PostFix
2011 - 2016
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'RECEIVED <br />�8Y �� YOi� <br />UST S����TEU� ����T��|�FIT o��� ��EP��I�� MAY " � ^,.^ <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by E'-MVIRONMENTAL HEALTH <br />1 Site map enclosed? YES[} NO[) PERMIT/SERVICES <br />2 Submit copies of]CC Service Technician and/or Installers certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure o copy of the "Site Health and Safety <br />Plan- isavailable onthe jobsitoesrequired byTitle 8 <br />J Detailed description ofwork !obecompleted. List components tnberepaired orreplaced and attach a diagram drawn <br />to scale showing location ofrepairs and/or replacements. If repairing aoomponent. describe hovvthis will be done.(|f <br />adding piping, UDC'» orother UST equipment,urpe�onn/ngtank top upgrade. use the UST Installation Application <br />pages 4'Daonecessary for atimely plan roviaw)� <br />4. List cfequipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.