Laserfiche WebLink
EDSTgTFs RECEIVED <br /> o� yIr <br /> U.S. ENVIRONMENTAL PROTECTION AGENCY <br /> NOV 04 2013 <br /> Z��yrq�PRDtTIER I QUALIFIED FACILITY SPCC PLAN TEMPLATE <br /> ENVIRONMENTAL <br /> Instructions to Complete this Template HEALTH DEPARTMENT <br /> This template is intended to help the owner or operator of a Tier I qualified facility develop a self-certified Spill Prevention, <br /> Control, and Countermeasure (SPCC) Plan. To use this template, your facility must meet all of the applicability criteria of a Tier I <br /> qualified facility listed under§112.3(g)(1) of the SPCC rule. This template provides every SPCC rule requirement necessary for <br /> a Tier I qualified facility, which you must address and implement. <br /> You may use this template to comply with the SPCC regulation or use it as a model and modify it as necessary to meet your <br /> facility-specific needs. If you modify the template, your Plan must include a section cross-referencing the location of each <br /> applicable requirement of the SPCC rule and you must ensure that your Plan is an equivalent Plan that meets all applicable rule <br /> requirements of 40 CFR 112.6(a)(3). <br /> You may complete this template either electronically or by hand on a printed copy. This document is a reformatted version of the <br /> template found in Appendix G of 40 CFR part 112.a No substantive changes have been made. Please note that a "Not <br /> Applicable" ("N/A") column has been added to both Table G-10 (General Rule Requirements for Onshore Facilities) and Table <br /> G-11 (General Rule Requirements for Onshore Oil Production Facilities). The "N/A" column should help you complete your self- <br /> certification when a required rule element does not apply to your facility. Use of the "N/A"column is optional and is not required <br /> by rule. <br /> All Tier I qualified facility self-certifiers must complete Sections I, II, and III. Additionally, the owner or operator of an: <br /> • Onshore facility(excluding production) must complete Section A. <br /> • Onshore oil production facility(excluding drilling and workover facilities) must complete Section B. <br /> • Onshore oil drilling and workover facility must complete Section C. <br /> Complete and include with your Plan the appropriate attachments. You should consider printing copies of the attachments for <br /> use in implementing the SPCC Plan (e.g. Attachment 3.1 - Inspection Log & Schedule; <br /> Attachment 4 - Discharge Notification Form). <br /> To complete the template, check the box next to the requirement to indicate that it has been adequately addressed. Either write <br /> "N/A" in the column or check the box under the"N/A" column to indicate those requirements that are not applicable to the facility. <br /> Where a section requires a description or listing, write in the spaces provided (or attach additional descriptions if more space is <br /> needed). <br /> Below is a key for the colors used in the section headers: <br /> Sections I, II,and III: Required for all Tier I qualified facilities <br /> Section A: Onshore facilities(excluding production) <br /> Section B: Onshore oil production facilities(excluding drilling and workover facilities) <br /> Section C: Onshore oil drilling and workover facilities <br /> Attachments: 1 -Five Year Review and Technical Amendment Logs <br /> 2-Oil Spill Contingency Plan and Checklist <br /> 3- Inspections, Dike Drainage and Personnel Training Logs <br /> 4-Discharge Notification Form <br /> After you have completed all appropriate sections, certify and date your Plan, and then implement it by the compliance date. If <br /> your facility was in operation before August 16, 2002, and you do not already have a Plan, then implement this template <br /> immediately. Conduct inspections and tests in accordance with the written procedures that you have developed for your facility. <br /> You must keep with the SPCC Plan a record of these inspections and tests, signed by the appropriate supervisor or inspector, <br /> for a period of three years. <br /> Do not forget to periodically review your Plan (at least once every five years) or to update it when you make changes to your <br /> facility. You must prepare amendments within six months of the facility change, and implement them as soon as possible, but <br /> not later than six months following preparation of any amendment. <br /> In the event that your facility releases oil to navigable waters or adjoining shorelines, immediately call the National Response <br /> Center(NRC) at 1-800-424-8802. The NRC is the federal government's centralized reporting center, which is staffed 24 hours <br /> per day by U.S. Coast Guard personnel. <br /> a Please note that the use of this template is not mandatory for a Tier I qualified facility. You may also meet the SPCC Plan requirement by preparing a <br /> satisfactory Tier II qualified facility Plan,preparing a satisfactory Plan that is certified by a Professional Engineer,or by developing an equivalent Plan for <br /> a Tier I qualified facility. Further information on the requirements of these methods can be found in 40 CFR part 112.6(a)(1). If you use any of these <br /> alternative methods you must include a cross reference in your Plan that shows how the equivalent Plan meets all applicable 40 CFR part 112 <br /> requirements. <br />