My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ANDERSON
>
2141
>
2200 - Hazardous Waste Program
>
PR0515670
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 8:02:46 AM
Creation date
10/30/2018 2:05:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515670
PE
2220
FACILITY_ID
FA0005848
FACILITY_NAME
STOCKTON TRI INDUSTRIES INC
STREET_NUMBER
2141
Direction
E
STREET_NAME
ANDERSON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15530005
CURRENT_STATUS
01
SITE_LOCATION
2141 E ANDERSON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ver. 1-E-doc-3-18-10 <br />Table G-10 General Rule Requirements for Onshore Facilities <br />N/A <br />Each container is provided with a system or documented procedure to prevent overfills for the container. <br />Z <br />El <br />Describe: <br />The amount of fuel in the diesel fuel and gasoline tanks (Tanks 1 & 2) located in <br />the south facility yard, south of manufacturing building are measured using a dip <br />stick prior to replenishing the diesel fuel tank. The tank and is filled only under <br />close supervision and the fueler has an automatic shutoff valve on their fueling <br />equipment so that filling can stop immediately when the container is full. <br />Absorbent material is available to clean up any drips or small spills and the fueler <br />is equipped with a spill kit. <br />Used oils drums are filled only under close supervision by facility personnel and <br />visually observed for fill level. Absorbent material is available to clean up any <br />drips or small spills and the used oil storage area is equipped with a spill kit. <br />Liquid level sensing devices are regularly tested to ensure proper operation [See Inspection Log and <br />❑ <br />Schedule in Attachment 3.1]. (§112.6 a 3 iii ] <br />Visible discharges which result in a loss of oil from the container, including but not limited to seams, <br />gaskets, piping, pumps, valves, rivets, and bolts are promptly corrected and oil in diked areas is promptly <br />removed. (§§112.8 c 10 and 1 12.12 c 10 ] <br />Aboveground valves, piping, and appurtenances such as flange joints, expansion joints, valve glands and <br />® <br />❑ <br />bodies, catch pans, pipeline supports, locking of valves, and metal surfaces are inspected regularly. [See <br />Inspection Log and Schedule in Attachment 3.1] (§§112.8(d)(4) and 112.12(d)(4)] <br />Integrity and leak testing are conducted on buried piping at the time of installation, modification, <br />❑ <br />construction, relocation, or replacement. [See Inspection Log and Schedule in Attachment 3.1] <br />[§§ 1 12.8 d 4 and 1 12.12 d 4 ] <br />NOV 0 4 2013 <br />ENVIRONMENTAL <br />HEALTH DEPARTMENT <br />Facility Name: Stockton Tri Industries, Inc. Page 10 Tier I Qualified Facility SPCC Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.