My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ANDERSON
>
2141
>
2200 - Hazardous Waste Program
>
PR0515670
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 8:02:46 AM
Creation date
10/30/2018 2:05:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515670
PE
2220
FACILITY_ID
FA0005848
FACILITY_NAME
STOCKTON TRI INDUSTRIES INC
STREET_NUMBER
2141
Direction
E
STREET_NAME
ANDERSON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15530005
CURRENT_STATUS
01
SITE_LOCATION
2141 E ANDERSON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ver. 1-E-doc-3-18-10 <br />ATTACHMENT 2 — Oil Spill Contingency Plan and Checklist <br />An oil spill contingency plan and written commitment of resources is required for: <br />• Flow lines and intra -facility gathering lines at oil production facilities and <br />• Qualified oil -filled operational equipment which has no secondary containment. <br />An oil spill contingency plan meeting the provisions of 40 CFR part 109, as described below, and a written <br />commitment of manpower, equipment and materials required to expeditiously control and remove any quantity <br />of oil discharged that may be harmful is attached to this Plan. <br />Complete the checklist below to verify that the necessary operations outlined in 40 CFR part 109 - Criteria for State, Local and Regional <br />Oil Removal Contingency Plans - have been included. <br />a The contingency plan must be consistent with all applicable state and local plans, Area Contingency Plans, and the National <br />Contingency Plan (NCP) <br />Facility Name: Stockton Tri Industries, Inc. Page 13 Tier I Qualified Facility SPCC Plan <br />list of Development and Implementation Criteria for State, Local and Regional Oil Removal <br />S a e 1S Not <br />(a)This <br />(b <br />Applicable <br />situation exceeds the response capability of the State, local or regional authority. <br />(c) Provisions to assure that full resource capability is known and can be committed during an oil discharge <br />situation including: <br />(1) The identification and inventory of applicable equipment, materials and supplies which are available <br />❑ <br />locally and regionally. <br />(2) An estimate of the equipment, materials and supplies which would be required to remove the maximum <br />❑ <br />oil discharge to be anticipated. <br />(3) Development of agreements and arrangements in advance of an oil discharge for the acquisition of <br />equipment, materials and supplies to be used in responding to such a discharge. <br />(d) Provisions for well defined and specific actions to be taken after discovery and notification of an oil <br />discharge including: <br />(1) Specification of an oil discharge response operating team consisting of trained, prepared and available <br />❑ <br />operating personnel. <br />(2) Predesignation of a properly qualified oil discharge response coordinator who is charged with the <br />❑ <br />responsibility and delegated commensurate authority for directing and coordinating response operations <br />and who knows how to request assistance from Federal authorities operating under existing national <br />and regional contingency plans. <br />(3) A preplanned location for an oil discharge response operations center and a reliable communications <br />❑ <br />system for directing the coordinated overall response operations. <br />(4) Provisions for varying degrees of response effort depending on the severity of the oil discharge. <br />❑ <br />(5) Specification of the order of priority in which the various water uses are to be protected where more <br />❑ <br />than one water use may be adversely affected as a result of an oil discharge and where response <br />operations may not be adequate to protect all uses. <br />(6) Specific and well defined procedures to facilitate recovery of damages and enforcement measures as <br />❑ <br />provided for by State and local statutes and ordinances. <br />a The contingency plan must be consistent with all applicable state and local plans, Area Contingency Plans, and the National <br />Contingency Plan (NCP) <br />Facility Name: Stockton Tri Industries, Inc. Page 13 Tier I Qualified Facility SPCC Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.