My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALMONDWOOD
>
5151
>
2200 - Hazardous Waste Program
>
PR0518276
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 1:53:14 PM
Creation date
10/31/2018 9:03:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0518276
PE
2220
FACILITY_ID
FA0013802
FACILITY_NAME
CEN-CAL SERVICES INC
STREET_NUMBER
5151
Direction
E
STREET_NAME
ALMONDWOOD
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
24343013
CURRENT_STATUS
02
SITE_LOCATION
5151 E ALMONDWOOD DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALMONDWOOD\5151\PR0518276\COMPLIANCE INFO\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
8/6/2013 8:00:00 AM
QuestysRecordID
2022454
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cera-Cal <br /> Services Inc. <br /> Metal Fabrication /Maintenance <br /> Contractor#575942 <br /> November 29, 1999 <br /> Public Health Services of San Joaquin County <br /> 304 E. Weber Ave. Third Floor <br /> Stockton, Ca. 95202 <br /> Attn.: Mathew Parker <br /> Environmental Health Specialist <br /> Dear Mr. Parker, <br /> I am writing you this letter to inform you of our progress of action in correcting the items you <br /> brought to our attention on the 10/20/99 walk through. Item eleven concerning EPA ID # is <br /> completed. All hazardous waste materials have been labeled correctly and noticeably. Item <br /> twelve concerning leaking tools and tanks are in the progress of completion. All leaking tanks <br /> have been removed and we have scheduled Penrod Sheetmetal Machinery Repair to come into <br /> our shop and repair all machinery that leaks. Unfortunately, we cannot get him in our facility <br /> until the first week of January due to his hectic schedule. Item forty-three concerning a <br /> Contingency Plan is also in the process of completion. I expect to have it completed in the first <br /> week of December. Item seventy-six concerning a SPCC is also in the process of completion. <br /> I know that our deadline date was November 20, 1999 but , due to an extended Thanksgiving <br /> holiday and also a hectic schedule I have not completed all requirements by that time. Currently <br /> we are about 90% into this and we were hoping for a bit more time. If there is a possibility we <br /> can receive a one month extension to December 20, 1999 we would greatly appreciate it. If this <br /> request is not possible, I completely understand and I will try to get everything completed as <br /> soon as I can. <br /> I thank you for your time and I hope we will touch bases soon to work this all out. <br /> i e y, /� <br /> im a ambra <br /> Safety Coordinator <br /> 5151 E.Almondwood Drive • Manteca, CA 95337 - (2"239-5664 <br />
The URL can be used to link to this page
Your browser does not support the video tag.