Laserfiche WebLink
MCCCJf71q_bell_Analytical, Inc. u'F�*1 loll—(87).52.9262,.c (925)252.9 <br /> _ _ u�pMxK(%77)252•H261�Fac.{925)252A26H <br /> III lien )Nalile Councr -� bnp .nxcampbcg coin/E•nteir.auim-cwpbell— <br /> WORK ORDER SUMMARY <br /> Client Name: FREMOt-1W ENVIRONMENTAL SERVICES,INC. Project: 067753;Herzog Track 1t ork Order: 1611556 <br /> Client Contact: Dina Barron Q( Les el: LEVEL 2 <br /> Contact's Email: dbarron@hazwasteremoval.com; Comments: Date l.ogied: 11/11/2016 <br /> pfremouwta haz,Awteremoval.com <br /> WaterTrax �_!WrdeOn [–]EOF Excel E]Fax ]Email ,_]HardCopy `-'�,ThirdParty d-!'.ay - <br /> Lab ID Client ID Matrix Test Name Containers Bottle&Preservative Do- Collection Date TAT Sedi,mm Hold Subqut <br /> /Composites chlorinated &Time (ontent <br /> 1611556-001A Hezog S-I Soil SW8015B(Diesel&Motor Oil) I Stamle Steel tnbe 2"W 0 1I:10,2016 11 15 3days El <br /> 1611556-002A Hering S-2 Soil SW8015B(Diesel&Motor Oil) 1 Siamless Steel tube 2"xV ❑ 11/10/2016 11:17 3 days <br /> 1611556.003A tlereog S•3 soil SW80156(Diesel&Motor Oil) I Sta.]--Steel tube 2"s6" 11 Ili 10/2016 11:20 3 da)s CI <br /> 1611556-004A Hang S-a Soil SW80156(Diesel&'Motor Oil) I Stainless Steel tube 2"x6" 1:1 I li 102016 11,25 3 days <br /> 161155E-005A Harog S•5 Soil SW8015B(Diesel&Motnr Odi I Stamless Steel tube 2"x6' O 11,10,=016 11 30 3 days 1-1 <br /> NOTES: -STLC and TCLP extractions require 2 days to complete:therefore,all TATs begin after the extraction is completed(i.e.,One-day TAT yields results <br /> In 3 days from sample submission). <br /> -MAI assumes that all material present in the provided sampling container is considered part of the sample-MAI does not exclude any material from <br /> the sample prior to sample preparation unless requested in writing by the client. <br />