Laserfiche WebLink
Brad Parsons February 29, 1984 <br /> Generator Inspection <br /> Triangle Pacific Corp. <br /> removed within 90 days by a registered hauler. None of the drums were <br /> labeled with accumulation start dates . Mr. Helton mentioned that it <br /> is very difficult to remove the empty drums within 90 days, as Rose <br /> Cooperdge requires an accumulation of at least 80 drums. I suggested <br /> that other drum recyclers be contacted and agreed to send Mr. Helton <br /> a list of drum recyclers. <br /> SP:st <br />