Laserfiche WebLink
M N <br /> VIII. OBSERVATIONS: <br /> I arrived at ASCO/Delta at approximately 1000 hours. I identified myself and asked <br /> to speak to the appropriate hazardous waste management person. <br /> I met with Mr. Alan Estes at the main office and explained the purpose of my visit. <br /> Mr. Estes and I reviewed the relevant documents, including hazardous waste <br /> manifests, waste stream profiles, contingency plan, and training records. <br /> Following the review of the operating records Mr. Estes escorted me to the <br /> hazardous waste storage area where paint cans are crushed and stored, also where <br /> the waste solvent barrels are stored. <br /> The final area Mr. Estes showed me was the automated paint booth and the <br /> production area. The paint booth is used to paint electrical control panels and <br /> equipment manufactured at this location. <br /> IX. DISCUSSION WITH MANAGEMENT: <br /> At the conclusion of the inspection I asked Mr. Estes if he had any questions, he <br /> stated he did not. He was informed that a copy of the inspection report would be <br /> mailed to him. This completed my inspection and I then left the facility. <br /> 3 <br />