Laserfiche WebLink
es Ho Comment <br /> Scovina of Checklist <br /> Does the facility generate a RCRA <br /> regulated hazardous waste? <br /> If no, omit pages 16 through 19, and questions with no State section cited. <br /> Does the generator qualify as a RCRA / <br /> conditionally exempt small quantity V/ <br /> generator by: — <br /> Generating less than 100 kg/mo, and / <br /> accumulating less than 1000 kg of RCRA ✓/ <br /> H.W. on site? [-/261.5 (a) , (g) ) or: — <br /> Generating and accumulating less than / <br /> 1 kg. o€ RCRA acute H.W. , or 100 kg of <br /> RCRA acute H.W. contaminated soil or <br /> spill residues? [-/261.5(e) (1-2) ) — <br /> Does the facility generate between 100 <br /> and 1000 kg of RCRA non-acute* H.W. per ' <br /> month, and never accumulate more than , <br /> 6000 kg of H.W. on site? — <br /> * Generators of more than 1 kg/mo, or who accumulate more than 1 kg at any <br /> time, of RCRA acute H.W. (listed in 261.33 (e) ) are lly regulated RCRA <br /> generators. (Reference -/261.5 (f) (2) ) <br /> Does the generator accumulate RCRA <br /> regulated H.W. onsite in tanks? — <br /> If yes, add Part 265, Subpart J checklist. <br /> Is the facility a farmer generating <br /> waste pesticide(s) ? — <br /> If no, omit page 15. <br /> Has the generator exported H.W. in the <br /> last 3 years? — <br /> If no, omit pages 16 through 20. <br /> NOTE: This page is designed to help you identify non-applicable sections <br /> the checklist. A "No" answer on this page does not indicate a violation. <br /> Page 2 <br />