Laserfiche WebLink
9. If the runoff cannot be diverted or contained on-site, place booms, spill <br />pads and absorbents at points along the flow to reduce possible adverse <br />impacts. <br />10. If there has been a release of water runoff to a nearby water body, the <br />Gas Plant Project in the Environmental Services Department will make the <br />appropriate state and federal agency contacts. <br />11. Whenever practical, replace excavated soils back into excavation once the <br />emergency situation is resolved. <br />12. Contact the Regional or Departmental Environmental Coordinator for <br />assistance in arranging for disposal of excess soil. <br />13. Assess damage to the facility and restore damaged areas to original <br />condition (i.e., replace pavement, fencing, etc.). <br />14. Replace all spill response equipment. <br />15. Complete Scene -Management Checklist (Section 8). <br />5-33 <br />